Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects

There is great concern in Uganda about delays and cost overruns in public sector construction projects because such projects are implemented using taxpayers' money. At the national and international levels, there is considerable debate regarding how to minimise project delays and cost overruns. The main objective of this study was to investigate the causes of construction project delays and cost overruns in Uganda's public sector. Specifically, this study was conducted to identify the causes of delays and overruns and to rank them according to their frequency, severity and importance. The Civil Aviation Authority (CAA) was selected as a case study as a means of validating the results of the survey. Frequency index, severity index and importance index values were computed and all 20 factors involved were ranked. The five most important causes of delays in construction projects were found to be the following: changes to the scope of work, delayed payments, poor monitoring and control, the high cost of capital and political insecurity and instability. The relationship between the factors that cause delays and those that cause cost overruns was found to be moderate. Recommendations are made for improved project management, a change from the traditional contract type to the design-build type and improved cash flow on the part of the client to reduce payment delays. The results of this research should help construction practitioners, policy makers and researchers in the field of construction management.

[1]  P. Ghoddosi,et al.  Fuzzy Assessment of Causes of Time Overrun (Delays) in Iran`s Dam Construction Projects , 2008 .

[2]  P McGovern,et al.  THE COST ESCALATION OF RAIL PROJECTS: USING PREVIOUS EXPERIENCE TO RE-EVALUATE THE CALSPEED ESTIMATES. WORKING PAPER , 1993 .

[3]  Henry Mwanaki Alinaitwe Improvement of Labour Performance and Productivity in Uganda´s Building Industry , 2008 .

[4]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[5]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[6]  John Bacon-Shone,et al.  Introduction to Quantitative Research Methods , 2013 .

[7]  Peter Caputi,et al.  Introduction to quantitative research methods , 2001 .

[8]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[9]  Ivars Avotos,et al.  Cost-relevance analysis for overrun control , 1983 .

[10]  Mohammed Al-Khalil,et al.  Important causes of delay in public utility projects in Saudi Arabia , 1999 .

[11]  K. C. Iyer,et al.  Understanding time delay disputes in construction contracts , 2008 .

[12]  Ibnu Abbas Majid Causes and effect of delays in Aceh construction industry , 2006 .

[13]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[14]  Cost overruns Risk Analysis in Transportation Infrastructure Investments , 2007 .

[15]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[16]  Nabil Kartam,et al.  Impact of construction materials on project time and cost in Kuwait , 2004 .

[17]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[18]  Bengt Hansson,et al.  Factors affecting the productivity of building craftsmen ‐ studies of Uganda , 2007 .

[19]  Ronald McCaffer,et al.  FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .