Multiobjective Scheduling of Dual-Blade Robotic Cells in Wafer Fabrication
暂无分享,去创建一个
NaiQi Wu | MengChu Zhou | Yan Hou | Yan Qiao | QingHua Zhu | Mengchu Zhou | N. Wu | Qinghua Zhu | Yan Qiao | Yan Hou
[1] MengChu Zhou,et al. Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation , 2012, IEEE Transactions on Automation Science and Engineering.
[2] Chelliah Sriskandarajah,et al. Scheduling in Dual Gripper Robotic Cells for Productivity Gains , 2001, IEEE Trans. Robotics Autom..
[3] Jun-Ho Lee,et al. Scheduling Lot Switching Operations for Cluster Tools , 2013, IEEE Transactions on Semiconductor Manufacturing.
[4] H. Neil Geismar,et al. Robotic Cells with Parallel Machines: Throughput Maximization in Constant Travel-Time Cells , 2004, J. Sched..
[5] P. Ajayan,et al. Controllable and Rapid Synthesis of High-Quality and Large-Area Bernal Stacked Bilayer Graphene Using Chemical Vapor Deposition , 2014 .
[6] Rong Su,et al. Polynomial approach to optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools via Petri nets , 2018, IEEE/CAA Journal of Automatica Sinica.
[7] Milind Dawande,et al. On Throughput Maximization in Constant Travel-Time Robotic Cells , 2002, Manuf. Serv. Oper. Manag..
[8] Naiqi Wu,et al. Petri net-based approach to short-term scheduling of crude oil operations with less tank requirement , 2017, Inf. Sci..
[9] MengChu Zhou,et al. Modeling, Analysis and Control of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation Based on Petri Nets , 2012, IEEE Transactions on Automation Science and Engineering.
[10] Richard Y. K. Fung,et al. Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times , 2016, J. Sched..
[11] Zhiwu Li,et al. Energy efficiency optimization in scheduling crude oil operations of refinery based on linear programming , 2017 .
[12] Meyya Meyyappan,et al. A review of plasma enhanced chemical vapour deposition of carbon nanotubes , 2009 .
[13] MengChu Zhou,et al. Petri Net Modeling and Cycle-Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting , 2013, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[14] Tae-Eog Lee,et al. Schedulability Analysis of Time-Constrained Cluster Tools With Bounded Time Variation by an Extended Petri Net , 2008, IEEE Transactions on Automation Science and Engineering.
[15] MengChu Zhou,et al. Scheduling Transient Processes for Time-Constrained Single-Arm Robotic Multi-Cluster Tools , 2017, IEEE Transactions on Semiconductor Manufacturing.
[16] MengChu Zhou,et al. Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[17] Feng Chu,et al. A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.
[18] Xiaodong Yao,et al. Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Systems: Software Tool and Simulation Case Studies , 2010, IEEE Transactions on Semiconductor Manufacturing.
[19] Shengwei Ding,et al. Steady-State Throughput and Scheduling Analysis of Multi-Cluster Tools for Semiconductor Manufacturing: A Decomposition Approach , 2005, Proceedings of the 2005 IEEE International Conference on Robotics and Automation.
[20] MengChu Zhou,et al. Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing , 2015, IEEE Transactions on Semiconductor Manufacturing.
[21] Tae-Sun Yu,et al. Wafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations , 2020, Int. J. Prod. Res..
[22] Chelliah Sriskandarajah,et al. Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot , 2004, Oper. Res..
[23] James R. Morrison,et al. Transient scheduling of single armed cluster tools: Algorithms for wafer residency constraints , 2013, 2013 IEEE International Conference on Automation Science and Engineering (CASE).
[24] MengChu Zhou,et al. Scheduling of Single-Arm Cluster Tools for an Atomic Layer Deposition Process With Residency Time Constraints , 2017, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[25] James R. Morrison,et al. Controlled Wafer Release in Clustered Photolithography Tools: Flexible Flow Line Job Release Scheduling and an LMOLP Heuristic , 2015, IEEE Transactions on Automation Science and Engineering.
[26] Naiqi Wu,et al. System Modeling and Control with Resource-Oriented Petri Nets , 2009 .
[27] C. Gómez-Aleixandre,et al. Review of CVD Synthesis of Graphene , 2013 .
[28] Rong Su,et al. Modeling and Optimal Cyclic Scheduling of Time-Constrained Single-Robot-Arm Cluster Tools via Petri Nets and Linear Programming , 2020, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[29] Hyun-Jung Kim,et al. Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module , 2017, Int. J. Prod. Res..
[30] Jun-Ho Lee,et al. Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots , 2013, IEEE Transactions on Automation Science and Engineering.
[31] Tatsushi Nishi,et al. Petri Net Decomposition Approach to Deadlock-Free and Non-Cyclic Scheduling of Dual-Armed Cluster Tools , 2015, IEEE Transactions on Automation Science and Engineering.
[32] Jun-Ho Lee,et al. Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation , 2016, IEEE Transactions on Automation Science and Engineering.
[33] Chelliah Sriskandarajah,et al. Scheduling Dual Gripper Robotic Cell: One-Unit Cycles , 2006, Eur. J. Oper. Res..
[34] MengChu Zhou,et al. Pareto-Optimization for Scheduling of Crude Oil Operations in Refinery via Genetic Algorithm , 2017, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[35] Jun-Ho Lee,et al. Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules , 2017, IEEE Transactions on Automation Science and Engineering.
[36] Andrew J. Davenport. Integrated Maintenance Scheduling for Semiconductor Manufacturing , 2010, CPAIOR.
[37] MengChu Zhou,et al. Optimal One-Wafer Cyclic Scheduling and Buffer Space Configuration for Single-Arm Multicluster Tools With Linear Topology , 2016, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[38] Wlodzimierz M. Zuberek,et al. Timed Petri nets in modeling and analysis of cluster tools , 2001, IEEE Trans. Robotics Autom..
[39] Tae-Eog Lee,et al. Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation , 2012 .
[40] Tae-Eog Lee,et al. Optimal scheduling of dual-armed cluster tools without swap restriction , 2008, 2008 IEEE International Conference on Automation Science and Engineering.
[41] MengChu Zhou,et al. Wafer Sojourn Time Fluctuation Analysis of Time-Constrained Dual-Arm Cluster Tools With Wafer Revisiting and Activity Time Variation , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[42] MengChu Zhou,et al. A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools With Wafer Residency Time Constraint Based on Steady Schedule Analysis , 2010, IEEE Transactions on Automation Science and Engineering.
[43] Tae-Eog Lee,et al. An extended event graph with negative places and tokens for time window constraints , 2005, IEEE Transactions on Automation Science and Engineering.
[44] Hyun Joong Yoon,et al. Online scheduling of integrated single-wafer processing tools with temporal constraints , 2005, IEEE Transactions on Semiconductor Manufacturing.
[45] MengChu Zhou,et al. Robust Scheduling of Time-Constrained Dual-Arm Cluster Tools With Wafer Revisiting and Activity Time Disturbance , 2019, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[46] S. Venkatesh,et al. A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots , 1997 .
[47] MengChu Zhou,et al. Scheduling and Control of Startup Process for Single-Arm Cluster Tools With Residency Time Constraints , 2017, IEEE Transactions on Control Systems Technology.
[48] Tae-Eog Lee,et al. Scheduling analysis of time-constrained dual-armed cluster tools , 2003 .
[49] Tae-Eog Lee,et al. Modeling and implementing a real-time scheduler for dual-armed cluster tools , 2001, Comput. Ind..
[50] Wai Kin Chan,et al. Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis , 2011, IEEE Transactions on Automation Science and Engineering.
[51] Tae-Sun Yu,et al. Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs , 2017, IEEE Transactions on Semiconductor Manufacturing.
[52] Qinghua Zhu,et al. Optimal integrated schedule of entire process of dual-blade multi-cluster tools from start-up to close-down , 2019, IEEE/CAA Journal of Automatica Sinica.
[53] MengChu Zhou,et al. An Efficient Scheduling Method for Crude Oil Operations in Refinery With Crude Oil Type Mixing Requirements , 2016, IEEE Transactions on Systems, Man, and Cybernetics: Systems.