An Enumeration Algorithm for the No-Wait Flow Shop Problem with Due Date Constraints
暂无分享,去创建一个
[1] Shaukat A. Brah,et al. A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors , 1996 .
[2] Hai Bo Tang,et al. A New Hybrid Particle Swarm Optimization for Solving Flow Shop Scheduling Problem with Fuzzy due Date , 2011 .
[3] Christos Koulamas,et al. An O(n2) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines , 2012, Eur. J. Oper. Res..
[4] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[5] Tarek Y. ElMekkawy,et al. Solving the no-wait flow-shop problem with sequence-dependent set-up times , 2014, Int. J. Comput. Integr. Manuf..
[6] S.M.T. Fatemi Ghomi,et al. Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates , 2014 .
[7] King-Wah Pang,et al. A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness , 2013 .
[8] Hamed Samarghandi,et al. A particle swarm optimisation for the no-wait flow shop problem with due date constraints , 2015 .
[9] Malgorzata Sterna,et al. Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date , 2008, Comput. Oper. Res..
[10] Laya Olfat,et al. Heuristic rules for tardiness problem in flow shop with intermediate due dates , 2014 .
[11] Hüseyin Sarper,et al. Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem , 1995 .
[12] Chandrasekharan Rajendran,et al. Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date , 2001, Eur. J. Oper. Res..
[13] Kut C. So,et al. A due-date assignment model for a flow shop with application in a lightguide cable shop , 1991 .
[14] Pankaj Chandna,et al. Hybrid genetic algorithm for SDST flow shop scheduling with due dates: a case study , 2010, Int. J. Adv. Oper. Manag..
[15] Rubén Ruiz,et al. No-wait flowshop with separate setup times to minimize maximum lateness , 2007 .
[16] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[17] Ali Allahverdi,et al. No-Wait Flowshops to Minimize Total Tardiness with Setup Times , 2015 .
[18] Marcelo Seido Nagano,et al. Review and classification of constructive heuristics mechanisms for no-wait flow shop problem , 2016 .
[19] T. Elmekkawy,et al. A meta-heuristic approach for solving the no-wait flow-shop problem , 2012 .
[20] J. R. Shah,et al. Performance of priority rules in a due date flow shop , 1992 .
[21] Malgorzata Sterna,et al. The two-machine flow-shop problem with weighted late work criterion and common due date , 2005, Eur. J. Oper. Res..
[22] Amir Hasanzadeh,et al. A GRASP algorithm for the two-machine flow-shop problem with weighted late work criterion and common due date , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.
[23] Jatinder N. D. Gupta,et al. On the Solution of 2-Machine Flow Shop Problems With a Common Due Date , 2000 .