Conditions and costs for renewables electricity grid connection: Examples in Europe

This paper compares conditions and costs for RES-E grid connection in selected European countries. These are Germany, the Netherlands, the United Kingdom, Sweden, Austria, Lithuania and Slovenia. Country specific case studies are presented for wind onshore and offshore, biomass and photovoltaic power systems, as based on literature reviews and stakeholder interviews. It is shown that, especially for wind offshore, the allocation of grid connection costs can form a significant barrier for the installation of new RES-E generation if the developer has to bear all such costs. If energy policy makers want to reduce the barriers for new large-scale RES-E deployment, then it is concluded that the grid connection costs should be covered by the respective grid operator. These costs may then be recouped by increasing consumer tariffs for the use of the grid.

[1]  C. Weber,et al.  The costs of wind's intermittency in Germany: application of a stochastic electricity market model , 2007 .

[2]  W. Vermeulen,et al.  Social barriers in wind power implementation in The Netherlands: Perceptions of wind power entrepreneurs and local civil servants of institutional and social conditions in realizing wind power projects , 2007 .

[3]  Felix Alberto Farret,et al.  Interconnection of Alternative Energy Sources with the Grid , 2006 .

[4]  Timur Gul,et al.  Intermittency of wind: the wider picture , 2006 .

[5]  Joseph F. DeCarolis,et al.  The economics of large-scale wind power in a carbon constrained world , 2006 .

[6]  Felix A. Farret,et al.  Integration of alternative sources of energy , 2006 .

[7]  Goran Strbac,et al.  Total cost estimates for large-scale wind scenarios in UK , 2004 .

[8]  Kjetil Uhlen,et al.  Cost Analysis Case Study of Grid Integration of Larger Wind Farms , 2004 .

[9]  C. Gatzen,et al.  Planning of the grid integration of wind energy in Germany onshore and offshore up to the year 2020 , 2006 .

[10]  B. Alderfer,et al.  Making connections: Case studies of interconnection barriers and their impact on distributed power projects , 2000 .

[11]  S. Awerbuch Portfolio-Based Electricity Generation Planning: Policy Implications For Renewables And Energy Security , 2006 .

[12]  Christoph Haederli,et al.  Network integration of distributed power generation , 2002 .

[13]  Michael Milligan,et al.  Design and operation of power systems with large amounts of wind power : Final report, Phase one 2006-08, IEA WIND Task 25 , 2009 .

[14]  Hans Auer,et al.  Economics of large-scale intermittent RES-E integration into the European grids: analyses based on the simulation software GreenNet , 2006 .

[15]  A. Tuohy,et al.  Experience From Wind Integration in Some High Penetration Areas , 2007, IEEE Transactions on Energy Conversion.

[16]  M. J. Grubb,et al.  Value of variable sources on power systems , 1991 .

[17]  Thomas Ackermann,et al.  Technical Regulations for the Interconnection of Wind Farms to the Power System , 2005 .

[18]  D. Karlsson,et al.  Kriegers Flak 640 MW Off-Shore Wind Power Grid Connection—A Real Project Case Study , 2007, IEEE Transactions on Energy Conversion.

[19]  Lennart Söder,et al.  Design and operation of power systems with large amounts of wind power , 2009 .

[20]  Bernhard Hillebrand,et al.  The expansion of renewable energies and employment effects in Germany , 2006 .

[21]  Thomas Ackermann,et al.  Wind Power in Power Systems , 2005 .