Calculation of pile foundation coordination of curved bridge abutment

Integrating with specific engineering example,the paper puts forward the common calculation method of pile foundation coordination of curved bridge abutment,which is based on neighborhood pier bridge end size,prefabricated beam length and AutoCAD,and demonstrates and introduces the specific application,with a view to guide practice.