Throughput maximization and buffer design of robotized flexible production systems with feeder renewals and priority rules
暂无分享,去创建一个
Maurizio Faccio | Giulio Rosati | Luca Barbazza | Fabio Oscari | G. Rosati | Fabio Oscari | M. Faccio | Luca Barbazza
[1] G. Oriolo,et al. Robotics: Modelling, Planning and Control , 2008 .
[2] Maurizio Faccio,et al. Fully flexible assembly systems (F‐FAS): a new concept in flexible automation , 2013 .
[3] R. Manzini *,et al. Framework for designing a flexible cellular assembly system , 2004 .
[4] Cathal Heavey,et al. On the workload and 'phaseload' allocation problems of short reliable production lines with finite buffers , 2005, Comput. Ind. Eng..
[5] Maurizio Faccio,et al. Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines , 2012 .
[6] Damien Trentesaux,et al. Bottleneck-based opportunistic maintenance model for series production systems , 2015 .
[7] Wendy Wolfson,et al. Designing a parts feeding system for maximum flexibility , 1997 .
[8] Peter Nyhuis,et al. Aerodynamic feeding systems: An example for changeable technology , 2011 .
[9] Maurizio Faccio,et al. Design configuration for a mixed-model assembly system in case of low product demand , 2007 .
[10] Maurizio Faccio,et al. Modelling and optimization of fully flexible assembly systems (F‐FAS) , 2013 .
[11] Christophe Bérenguer,et al. Optimal Buffer Inventory and Opportunistic Preventive Maintenance Under Random Production Capacity Availability , 2008 .
[12] Velusamy Subramaniam,et al. Analysis of a two-stage, flexible production system with unreliable machines, finite buffers and non-negligible setups , 2013 .
[13] Maurizio Faccio,et al. Buffer design for availability: a new simulative study in case of infant and random failures , 2013 .
[14] Vittorio Cesarotti,et al. Buffer Size Design in Pharmaceutical Packaging Lines: An Analytical Methodology Proposal and Case Study , 2014 .
[15] Juhani Heilala,et al. Life cycle and unit-cost analysis for modular reconfigurable flexible light assembly systems , 2008 .
[16] Surendra M. Gupta,et al. Buffer allocation plan for a remanufacturing cell , 2005, Comput. Ind. Eng..
[17] Kazem Abhary,et al. Efficient Scheduling Rule for Robotic Flexible Assembly Cells Based on Fuzzy Approach , 2012 .
[18] Kazem Abhary,et al. A Scheduling Framework for Robotic Flexible Assembly Cells , 2013 .
[19] H. Neil Geismar,et al. Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models , 2010, Eur. J. Oper. Res..
[20] H. Neil Geismar,et al. Sequencing and Scheduling in Robotic Cells: Recent Developments , 2005, J. Sched..
[21] Maurizio Faccio,et al. Implementation framework for a fully flexible assembly system (F-FAS) , 2015 .
[22] Cathal Heavey,et al. Approximate analysis of serial flow lines with multiple parallel-machine stations , 2007 .
[23] A. H. Redford,et al. Generic flexible assembly system design , 2002 .
[24] Ozcan Kilincci,et al. Hybrid approach for buffer allocation in open serial production lines , 2015, Comput. Oper. Res..
[25] J. A. Buzacott,et al. AUTOMATIC TRANSFER LINES WITH BUFFER STOCKS , 1967 .
[26] Maurizio Faccio,et al. Mixed-model sequencing optimization for an automated single-station fully flexible assembly system (F-FAS) , 2014 .
[27] Gunther Reinhart,et al. Design of a modular feeder for optimal operating performance , 2010 .
[28] Patrick S. K. Chua,et al. Development of a flexible and programmable parts feeding system , 2005 .