Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews
暂无分享,去创建一个
[1] Iris D. Tommelein,et al. Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .
[2] R. Malcolm W. Horner,et al. Modeling Construction Labor Productivity , 1990 .
[3] Aura C. Matias. Work Measurement: Principles and Techniques , 2007 .
[4] Leonhard E. Bernold,et al. Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement , 1994 .
[5] Santiago,et al. Continuous improvement in construction management and technologies: A practical case , 1997 .
[6] Simaan M. AbouRizk,et al. Simphony-an integrated environment for construction simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[7] David Eaton,et al. Lean production productivity improvements for construction professions , 1997 .
[8] Simaan M. AbouRizk,et al. Application Framework for Development of Simulation Tools , 2000 .
[9] Lauri Koskela,et al. Lean manufacturing of construction components , 1997 .
[10] Douglas D. Gransberg. A review of methods to estimate haul fleet production , 1998 .
[11] Yasser Abdel-Rady I. Mohamed,et al. USING SIMULATION FOR IMPROVING PRODUCTIVITY OF DRAINAGE OPERATIONS , 2002 .
[12] Iris D. Tommelein,et al. More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .
[13] Daniel W. Halpin,et al. State of the art in construction simulation , 1992, WSC '92.
[14] Gregory A. Howell,et al. Toward construction JIT , 1997 .
[15] John Christian,et al. A computer-aided system to improve production rates in construction , 1996 .