Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews

The City of Edmonton’s Drainage Operations branch oversees the inspection, maintenance, and repair of the city’s drainage network. This network covers an area of 700.6 km2 to serve the city’s growing population of nearly 1 million people. The activities performed by this division consume a large amount of funding and are, therefore, receptive to improvements in productivity. The study presented in this paper was conducted to develop improved work methods and engineered productivity standards for the various drainage operations. The study focused on six crews, which accounted for over 25% of the total drainage operations budget. The six crews were divided based on their respective duties: (1) cleaning mains by low pressure flushing (LPF); (2) cleaning mains by high pressure flushing; (3) scheduled mechanical cleaning of catch basins (CBC); (4) inspecting mains by televising; (5) commercial establishment investigation; and (6) service-line rodding and televising. The study utilized the concept of work simpl...

[1]  Iris D. Tommelein,et al.  Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .

[2]  R. Malcolm W. Horner,et al.  Modeling Construction Labor Productivity , 1990 .

[3]  Aura C. Matias Work Measurement: Principles and Techniques , 2007 .

[4]  Leonhard E. Bernold,et al.  Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement , 1994 .

[5]  Santiago,et al.  Continuous improvement in construction management and technologies: A practical case , 1997 .

[6]  Simaan M. AbouRizk,et al.  Simphony-an integrated environment for construction simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[7]  David Eaton,et al.  Lean production productivity improvements for construction professions , 1997 .

[8]  Simaan M. AbouRizk,et al.  Application Framework for Development of Simulation Tools , 2000 .

[9]  Lauri Koskela,et al.  Lean manufacturing of construction components , 1997 .

[10]  Douglas D. Gransberg A review of methods to estimate haul fleet production , 1998 .

[11]  Yasser Abdel-Rady I. Mohamed,et al.  USING SIMULATION FOR IMPROVING PRODUCTIVITY OF DRAINAGE OPERATIONS , 2002 .

[12]  Iris D. Tommelein,et al.  More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .

[13]  Daniel W. Halpin,et al.  State of the art in construction simulation , 1992, WSC '92.

[14]  Gregory A. Howell,et al.  Toward construction JIT , 1997 .

[15]  John Christian,et al.  A computer-aided system to improve production rates in construction , 1996 .