Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy
暂无分享,去创建一个
[1] Dr. Syed Abdul Rehman Khan. Usage of RFID Technology in Supply Chain : Benefits and Challenges , 2016 .
[2] Jens Clausen,et al. A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case , 2006, Eur. J. Oper. Res..
[3] Arthur F. Veinott,et al. Analysis of Inventory Systems , 1963 .
[4] Julius Surkis,et al. A control policy for multi-item inventories with fluctuating demand using simulation , 1975, Comput. Oper. Res..
[5] M.-F. Wu,et al. A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery , 2015 .
[6] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..
[7] M Cedillo Campos,et al. Dynamic Self-Assessment of Supply Chains Performance: an Emerging Market Approach , 2013 .
[8] R. J. Tersine. Principles of inventory and materials management , 1982 .
[9] Y-S. P. Chiu,et al. Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” Using an Alternative Approach , 2013 .
[10] L. B. Schwarz,et al. Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System , 1985 .
[11] Y. P. Chiu,et al. Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process , 2016 .
[12] Anthony J. Zahorik,et al. Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems , 1984 .
[13] J.-S. Kuo,et al. Effect of delayed differentiation on a multiproduct vendor-buyer integrated inventory system with rework , 2016 .
[14] N. Bryson,et al. Joint Vendor-buyer Policy in JIT Manufacturing , 1995 .
[15] B. N. Khoury,et al. The common cycle approach to the ELSP problem with insufficient capacity , 2001 .
[16] Chih-Kai Chang,et al. Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework , 2016, PloS one.
[17] Bernard Kamsu-Foguem,et al. Mining association rules for the quality improvement of the production process , 2013, Expert Syst. Appl..
[18] Singa Wang Chiu,et al. Combining an alternative multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..
[19] S. R. Singh,et al. Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment , 2016 .
[20] S. R. Singh,et al. Analysis of three level supply chain of inventory with deterioration for multi-items , 2014 .
[21] Paul Zipkin. Performance Analysis of a Multi-Item Production-Inventory System Under Alternative Policies , 1995 .
[22] B. Sarkar,et al. An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand , 2013 .
[23] H. Fergany. Probabilistic multi-item inventory model with varying mixture shortage cost under restrictions , 2016, SpringerPlus.
[24] Felix Hueber,et al. Production And Operations Analysis , 2016 .
[25] Yuan-Shyi Peter Chiu,et al. Mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework , 2015, SpringerPlus.
[26] Mohamed Ben-Daya,et al. Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .
[27] Robert W. Grubbström,et al. The EOQ with backlogging derived without derivatives , 1999 .
[28] Hong-Dar Lin,et al. Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach , 2014 .
[29] Singa Wang Chiu,et al. Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .
[30] Singa Wang Chiu,et al. Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach , 2015 .
[31] Joaquín Sicilia,et al. Policies for a single-vendor multi-buyer system with finite production rate , 2008, Decis. Support Syst..
[32] Ming-Hon Hwang,et al. Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework , 2013 .
[33] Adam Janiak,et al. Batching work and rework processes with limited deterioration of reworkables , 2006, Comput. Oper. Res..
[34] K. Nygard,et al. A heuristic algorithm for a multi-product four-layer capacitated location-routing problem , 2014 .
[35] Singa Wang Chiu,et al. Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .
[36] Hong-Dar Lin,et al. Corrigendum to 'A note on "Intra-supply chain system with multiple sales locations and quality assurance"' [Experts Systems with Applications 40 (11) (2013) 4730-4732] , 2013, Expert Syst. Appl..
[37] Hong-Dar Lin,et al. A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..
[38] Manoranjan Maiti,et al. Multi-item inventory model of breakable items with stock-dependent demand under stock and time dependent breakability rate , 2010, Comput. Ind. Eng..
[39] Singa Wang Chiu,et al. Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..
[40] Kaj-Mikael Björk,et al. A multi-item fuzzy economic production quantity problem with a finite production rate , 2011 .
[41] M. D. Byrne. Multi-item production lot sizing using a search simulation approach , 1990 .
[42] Thomas J. Howard,et al. Production monitoring system for understanding product robustness , 2016 .
[43] Singa Wang Chiu,et al. Random Scrap Rate Effect on Multi-Item Finite Production Rate Model with Multi- Shipment Policy , 2013 .
[44] R L Schwaller. EOQ UNDER INSPECTION COSTS , 1988 .
[45] Jerome S. Osteryoung,et al. Use of the EOQ model for inventory analysis , 1986 .
[46] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[47] Kai-Ling Mak. Inventory control of defective products when the demand is partially captive , 1985 .
[48] Herbert Jodlbauer,et al. Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system , 2012 .
[49] Michael Godfrey,et al. Incorporating transportation costs into inventory replenishment decisions , 2002 .