Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy

This paper considers optimization of a multi-product economic production quantity (EPQ) model with scrap items and an improved multi-delivery policy. We extend the work of Chiu et al. (2013a) by incorporating an improved n + 1 multi-delivery plan into their model with an aim at reducing vendor’s inventory holding cost. Under such a specific shipment policy, for each product an extra delivery of finished goods is made during production uptime to satisfy the product demand for the period of vendor’s uptime. Then, when rework process comes to an end (i.e., the rest of the production lot is quality assured) n fixed quantity installments of finished goods are delivered to buyers at a fixed time interval. The objectives of this study are to determine the optimal rotation production cycle time that minimizes the long-run average system cost per unit time and reveals the effects of random scrap rate and the improved delivery policy on the optimal production cycle time. With the help of a mathematical model a closedform optimal common cycle time is derived. Through a numerical example, practical usages of obtained results and significant savings in vendor’s stock holding cost are demonstrated.

[1]  Dr. Syed Abdul Rehman Khan Usage of RFID Technology in Supply Chain : Benefits and Challenges , 2016 .

[2]  Jens Clausen,et al.  A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case , 2006, Eur. J. Oper. Res..

[3]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[4]  Julius Surkis,et al.  A control policy for multi-item inventories with fluctuating demand using simulation , 1975, Comput. Oper. Res..

[5]  M.-F. Wu,et al.  A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery , 2015 .

[6]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[7]  M Cedillo Campos,et al.  Dynamic Self-Assessment of Supply Chains Performance: an Emerging Market Approach , 2013 .

[8]  R. J. Tersine Principles of inventory and materials management , 1982 .

[9]  Y-S. P. Chiu,et al.  Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” Using an Alternative Approach , 2013 .

[10]  L. B. Schwarz,et al.  Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System , 1985 .

[11]  Y. P. Chiu,et al.  Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process , 2016 .

[12]  Anthony J. Zahorik,et al.  Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems , 1984 .

[13]  J.-S. Kuo,et al.  Effect of delayed differentiation on a multiproduct vendor-buyer integrated inventory system with rework , 2016 .

[14]  N. Bryson,et al.  Joint Vendor-buyer Policy in JIT Manufacturing , 1995 .

[15]  B. N. Khoury,et al.  The common cycle approach to the ELSP problem with insufficient capacity , 2001 .

[16]  Chih-Kai Chang,et al.  Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework , 2016, PloS one.

[17]  Bernard Kamsu-Foguem,et al.  Mining association rules for the quality improvement of the production process , 2013, Expert Syst. Appl..

[18]  Singa Wang Chiu,et al.  Combining an alternative multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..

[19]  S. R. Singh,et al.  Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment , 2016 .

[20]  S. R. Singh,et al.  Analysis of three level supply chain of inventory with deterioration for multi-items , 2014 .

[21]  Paul Zipkin Performance Analysis of a Multi-Item Production-Inventory System Under Alternative Policies , 1995 .

[22]  B. Sarkar,et al.  An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand , 2013 .

[23]  H. Fergany Probabilistic multi-item inventory model with varying mixture shortage cost under restrictions , 2016, SpringerPlus.

[24]  Felix Hueber,et al.  Production And Operations Analysis , 2016 .

[25]  Yuan-Shyi Peter Chiu,et al.  Mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework , 2015, SpringerPlus.

[26]  Mohamed Ben-Daya,et al.  Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .

[27]  Robert W. Grubbström,et al.  The EOQ with backlogging derived without derivatives , 1999 .

[28]  Hong-Dar Lin,et al.  Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach , 2014 .

[29]  Singa Wang Chiu,et al.  Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .

[30]  Singa Wang Chiu,et al.  Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach , 2015 .

[31]  Joaquín Sicilia,et al.  Policies for a single-vendor multi-buyer system with finite production rate , 2008, Decis. Support Syst..

[32]  Ming-Hon Hwang,et al.  Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework , 2013 .

[33]  Adam Janiak,et al.  Batching work and rework processes with limited deterioration of reworkables , 2006, Comput. Oper. Res..

[34]  K. Nygard,et al.  A heuristic algorithm for a multi-product four-layer capacitated location-routing problem , 2014 .

[35]  Singa Wang Chiu,et al.  Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .

[36]  Hong-Dar Lin,et al.  Corrigendum to 'A note on "Intra-supply chain system with multiple sales locations and quality assurance"' [Experts Systems with Applications 40 (11) (2013) 4730-4732] , 2013, Expert Syst. Appl..

[37]  Hong-Dar Lin,et al.  A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..

[38]  Manoranjan Maiti,et al.  Multi-item inventory model of breakable items with stock-dependent demand under stock and time dependent breakability rate , 2010, Comput. Ind. Eng..

[39]  Singa Wang Chiu,et al.  Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..

[40]  Kaj-Mikael Björk,et al.  A multi-item fuzzy economic production quantity problem with a finite production rate , 2011 .

[41]  M. D. Byrne Multi-item production lot sizing using a search simulation approach , 1990 .

[42]  Thomas J. Howard,et al.  Production monitoring system for understanding product robustness , 2016 .

[43]  Singa Wang Chiu,et al.  Random Scrap Rate Effect on Multi-Item Finite Production Rate Model with Multi- Shipment Policy , 2013 .

[44]  R L Schwaller EOQ UNDER INSPECTION COSTS , 1988 .

[45]  Jerome S. Osteryoung,et al.  Use of the EOQ model for inventory analysis , 1986 .

[46]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[47]  Kai-Ling Mak Inventory control of defective products when the demand is partially captive , 1985 .

[48]  Herbert Jodlbauer,et al.  Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system , 2012 .

[49]  Michael Godfrey,et al.  Incorporating transportation costs into inventory replenishment decisions , 2002 .