Measuring change management in manufacturing processes : a measurement method for simulation-game-based process development

The aim of this research is to find an answer to the research problem, which is "How can change management be measured in order to help manufacturing companies develop their manufacturing processes?" To solve the research problem, a constructive action research method is applied. The proposed solution to the research problem, i.e., a change management measurement system, is developed based on principles found in project management literature, process change management literature, performance measurement literature, three consultant surveys, and three case projects. Two of these three case projects applied simulation games as developmental tool, while one applied computer simulation. The proposed change management measurement system is evaluated through these three case projects, and thereafter both practised and further elaborated through two new case projects. The two new case projects are compared for gaining more sophisticated understanding of emerging patterns, and improvement suggestions for simulation-game-based change process utilising the change management measurement system are brought forward. Finally, the results are discussed, and the research and its contribution are evaluated through the quality criteria developed for this research. The measures in the change management measurement system are classified into two types: the first type gauges change project management itself, and the second assesses the outcomes of the change project, i.e., the improvements gained in manufacturing operations. Both of these types are measured in three dimensions: human resources, processes and technology, which are further divided into effectiveness and efficiency. Effectiveness is defined as the external, strategic performance: "doing the right thing," where strategically correct processes are developed, and strategically sound targets are pursued.

[1]  Edward Toomer,et al.  Qualitative Methods in Management Research , 1989 .

[2]  Natasa Rupcic,et al.  The fifth discipline-the art and practice of the learning organisation , 2002 .

[3]  Cathy S. Greenblat,et al.  Designing Games and Simulations: An Illustrated Handbook , 1987 .

[4]  Riitta Smeds Enterprise simulation laboratory for simulation games in virtual reality , 1997, Games in Production Management.

[5]  K. Lukka,et al.  The constructive approach in management accounting research , 1993 .

[6]  E. Ziegel,et al.  Balanced Scorecard , 2019, Encyclopedia of Public Administration and Public Policy, Third Edition.

[7]  Riitta Smeds Organizational learning and innovation through tailored simulation games: Two process re-engineering case studies , 1997 .

[8]  Tanja Tanayama,et al.  Empirical Analysis of Processes underlying Various Technological Innovations , 2001 .

[9]  Matti Aaltonen,et al.  Net in Pocket?: Personal mobile access to web services , 2002 .

[10]  E. Mayo The Human Problems of an Industrial Civilization , 1934, Nature.

[11]  George Jr. Stalk Hout Competing Against Time : How Time Based Competition Is Reshaping Global Markets , 2002 .

[12]  Riitta Smeds,et al.  Possibilities of Multimedia in Business Process Modeling and Simulation , 1998, Games in Operations Management.

[13]  R. Rapoport Three Dilemmas in Action Research , 1970 .

[14]  Nils-Göran Olve,et al.  Performance Drivers: A Practical Guide to Using the Balanced Scorecard , 1999 .

[15]  C. Eden,et al.  Action Research for Management Research , 1996 .

[16]  David K. Carr,et al.  Best Practices in Reengineering: What Works and What Doesn't in the Reengineering Process , 1995 .

[17]  A. Antonovsky Health, stress, and coping , 1979 .

[18]  W. G. Tymon,et al.  Necessary Properties of Relevant Research: Lessons from Recent Criticisms of the Organizational Sciences , 1982 .

[19]  Tuula Hakkarainen,et al.  Studies on fire safety assessment of construction products: Dissertation , 2002 .

[20]  Riitta Smeds,et al.  Games for organizational learning in production management , 1996, APMS.

[21]  Timo Sneck Hypoteeseista ja skenaarioista kohti yhteiskäyttäjien ennakoivia ohjantajärjestelmiä Ennakointityön toiminnallinen hyödyntäminen , 2002 .

[22]  Robert Karasek,et al.  Healthy Work : Stress, Productivity, and the Reconstruction of Working Life , 1990 .

[23]  M. Rogers,et al.  Control in an Age of Empowerment , 1995 .

[24]  Marco Iansiti,et al.  Rapid Learning and Adaptation in Product Development: An Empirical Study of the Internet Software Industry , 1998 .

[25]  G. Susman,et al.  An Assessment of the Scientific Merits of Action Research. , 1978 .

[26]  Riitta Smeds,et al.  Measuring Simulation Based Change Management in Manufacturing , 1998, Games in Operations Management.

[27]  Ruth Sacks Real change leaders: Jon Katzenbach and The Real Change Team, Nicholas Brealey Publishing (1996) 357 pp., £18.00 hb , 1996 .

[28]  R. Smeds Managing Change towards Lean Enterprises , 1994 .

[29]  L. Prusak The knowledge advantage , 1996 .

[30]  Jouni Pyykönen Computational simulation of aerosol behaviour , 2002 .

[31]  Päivi Haho,et al.  Participative development and training for business processes in industry: review of 88 simulation games , 2001, Int. J. Technol. Manag..

[32]  Steven C. Wheelwright,et al.  Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality , 1992 .

[33]  Thomas E. Vollmann,et al.  The Transformation Imperative: Achieving Market Dominance Through Radical Change , 1996 .

[34]  Jerry Banks,et al.  Handbook of simulation - principles, methodology, advances, applications, and practice , 1998, A Wiley-Interscience publication.

[35]  E. Ziegel,et al.  The Balanced Scorecard , 1998 .

[36]  R. Kaplan Innovation Action Research: Creating New Management Theory and Practice , 1998 .

[37]  Riitta Smeds Implementation of business process innovations: an agenda for research and action , 2001, Int. J. Technol. Manag..

[38]  Thomas H. Davenport,et al.  Process Innovation: Reengineering Work Through Information Technology , 1992 .

[39]  Pekka Tuomaala,et al.  Implementation and evaluation of air flow and heat transfer routines for building simulation tools , 2002 .

[40]  J. Banks,et al.  Handbook of Simulation , 1998 .

[41]  J. A. de Bruijn,et al.  Process management , 2002 .

[42]  Päivi Myllärinen,et al.  Myllärinen Starches-from granules to novel applications , 2002 .

[43]  Tuomas Tala,et al.  Transport barrier and current profile studies on the JET tokamak , 2002 .

[44]  R. Camp Business process benchmarking : finding and implementing best practices , 1995 .

[45]  Andy Neely,et al.  Performance measurement system design , 1995 .

[46]  H. D. Thomas,et al.  SUCCESSFUL KNOWLEDGE MANAGEMENT PROJECTS , 1998 .

[47]  Jouko Pakanen,et al.  An ARMAX-model approach for estimating static heat flows in buildings: A method for computerised energy allocation systems , 2002 .

[48]  Harry Boer,et al.  CI and performance: a CUTE approach , 1999 .

[49]  M. Hammer,et al.  REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .

[50]  Stefan H. Thomke,et al.  "Shortening Product Development Time Through 'Front-Loading' Problem-Solving"(in Japanese) , 1998 .

[51]  Marjaana Suutarinen,et al.  Effects of prefreezing treatments on the structure of strawberries and jams , 2002 .

[52]  Donald L. Schilling,et al.  Dynamic Project Management: A Practical Guide for Managers and Engineers , 1989 .

[53]  I. Nonaka,et al.  The Knowledge Creating Company , 2008 .

[54]  Vtt Publications,et al.  Electrochemical characterisation and modelling of passive films on Ni- and Fe-based alloys , 2002 .

[55]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[56]  J. Katzenbach,et al.  The discipline of teams. , 1993, Harvard business review.

[57]  Salem,et al.  Effects of lipids , heating and enzymatic treatment on starches 4 6 , 2002 .