Integrated Vendor–Buyer Lot-Sizing Model with Transportation and Quality Improvement Consideration under Just-in-Time Problem

This paper deals with the problem of transportation and quality within a Just-in-Time (JIT) inventory replenishment system. Formerly, transportation and quality problem are often modelled separately in most integrated inventory lot-sizing models. Hence, this paper develops an integrated vendor-buyer lot-sizing model by considering transportation and quality improvements into a JIT environment. The model is developed for minimising a total vendor–buyer system cost by optimising decisions such as delivery quantity, production batch, number of shipments, and process quality. Numerical examples and sensitivity analysis are provided to illustrate the proposed model. The developed model was also compared with an enumeration method to analyse the effectiveness of the proposed model to find the optimum solution. The results emphasise that the proposed model contributes to a new approach and obtains a near optimum solution for inventory replenishment decisions. The results are also beneficial to JIT practices as the model can improve the transport payload and reduce the chance of defective products and improving quality-related costs.

[1]  Daesung Ha,et al.  A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage , 2003 .

[2]  Chairul Saleh,et al.  Incorporating Transportation Cost into Joint Economic Lot Size For Single Vendor-Buyer , 2014, J. Softw..

[3]  Y. D. Huang,et al.  Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering , 2019 .

[4]  Ruhul A. Sarker,et al.  A recovery model for a two-echelon serial supply chain with consideration of transportation disruption , 2013, Comput. Ind. Eng..

[5]  M. A. Hoque,et al.  Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..

[6]  Ruhul A. Sarker,et al.  AN INVENTORY RECOVERY MODEL FOR AN ECONOMIC LOT SIZING PROBLEM WITH DISRUPTION , 2016 .

[7]  L. Ouyang,et al.  An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .

[8]  Jason Chao-Hsien Pan,et al.  Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .

[9]  S. Deshmukh,et al.  Coordinated supply management: review, insights, and limitations , 2009 .

[10]  Biswajit Sarkar,et al.  Joint Inventory and Pricing Policy for an Online to Offline Closed-Loop Supply Chain Model with Random Defective Rate and Returnable Transport Items , 2019, Mathematics.

[11]  M. N. A. Rahman,et al.  The implementation of cleaner production practices from Malaysian manufacturers' perspectives , 2015 .

[12]  Shine-Der Lee,et al.  Joint production and shipment lot sizing for a delivery price-based production facility , 2013 .

[13]  M. Mukhtar,et al.  AN INVENTORY MODEL WITH REWORKING AND SETUP TIME TO CONSIDER EFFECT OF INFLATION AND TIME VALUE OF MONEY , 2016 .

[14]  B. R. Sarker,et al.  Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system , 2010, J. Oper. Res. Soc..

[15]  M. A. Rahman,et al.  A STUDY ON LEAN MANUFACTURING IMPLEMENTATION IN MALAYSIAN AUTOMOTIVE COMPONENT INDUSTRY , 2014 .

[16]  Jalal Ashayeri,et al.  Multi-level inventory management decisions with transportation cost consideration , 2010 .

[17]  Biswajit Sarkar,et al.  A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate , 2019, Mathematics.

[18]  Chairul Saleh,et al.  Incorporating logistic costs into a single vendor–buyer JELS model , 2016 .

[19]  Michael Godfrey,et al.  Incorporating transportation costs into inventory replenishment decisions , 2002 .

[20]  Namhun Kim,et al.  Effects of variable production rate on quality of products in a single-vendor multi-buyer supply chain management , 2018, The International Journal of Advanced Manufacturing Technology.

[21]  C. Carter,et al.  JIT purchasing and performance: an exploratory analysis of buyer and supplier perspectives , 2001 .

[22]  C. Glock The joint economic lot size problem: A review , 2012 .

[23]  Chairul Saleh,et al.  Total cost reduction using a genetic algorithm for multi-vendor and single manufacturer , 2015 .

[24]  M. Darwish,et al.  Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..

[25]  Shine-Der Lee,et al.  Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost , 2014 .

[26]  B. Sarkar,et al.  Effect of variable transportation and carbon emission in a three-echelon supply chain model , 2016 .

[27]  S. Disney,et al.  THE IMPACT OF VENDOR MANAGED INVENTORY ON TRANSPORT OPERATIONS , 2003 .

[28]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[29]  Eric Sucky,et al.  Inventory management in supply chains: A bargaining problem , 2005 .

[30]  Biswajit Sarkar,et al.  Manufacturing quality improvement and setup cost reduction in a vendor-buyer supply chain model , 2017 .

[31]  Baba Md Deros,et al.  Application of Lean Six Sigma Tools for Cycle Time Reduction in Manufacturing: Case Study in Biopharmaceutical Industry , 2014 .

[32]  DaeSoo Kim,et al.  Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return , 2012 .

[33]  Biswajit Sarkar,et al.  Sustainable Lot Size in a Multistage Lean-Green Manufacturing Process under Uncertainty , 2018 .

[34]  Arshinder,et al.  Supply chain coordination: Perspectives, empirical studies and research directions , 2008 .

[35]  Sila Çetinkaya,et al.  A note on "quality improvement and setup reduction in the joint economic lot size model" , 2007, Eur. J. Oper. Res..

[36]  Xiaofei Xu,et al.  INCORPORATING TRANSPORTATION COSTS INTO JIT LOT SPLITTING DECISIONS FOR COORDINATED SUPPLY CHAINS , 2006 .

[37]  M. Javad Paknejad,et al.  Quality improvement and setup reduction in the joint economic lot size model , 2002, Eur. J. Oper. Res..

[38]  Noraida Azura Md Darom,et al.  An inventory model of supply chain disruption recovery with safety stock and carbon emission consideration , 2018, Journal of Cleaner Production.

[39]  Prafulla Joglekar Note-Comments on A Quantity Discount Pricing Model to Increase Vendor Profits , 1988 .

[40]  Fatih Mutlu,et al.  An Integrated Model for Stock Replenishment and Shipment Scheduling Under Common Carrier Dispatch Costs , 2010 .

[41]  M. RoseA.N.,et al.  A Study on Lean Manufacturing Implementation in Malaysian Automotive Component Industry , 2013 .