Integrated Vendor–Buyer Lot-Sizing Model with Transportation and Quality Improvement Consideration under Just-in-Time Problem
暂无分享,去创建一个
Chairul Saleh | Wan Mohd Faizal Wan Mahmood | Mohd Nizam Ab Rahman | Raden Achmad Chairdino Leuveano | M. N. A. Rahman | W. Mahmood | R. Leuveano | Chairul Saleh
[1] Daesung Ha,et al. A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage , 2003 .
[2] Chairul Saleh,et al. Incorporating Transportation Cost into Joint Economic Lot Size For Single Vendor-Buyer , 2014, J. Softw..
[3] Y. D. Huang,et al. Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering , 2019 .
[4] Ruhul A. Sarker,et al. A recovery model for a two-echelon serial supply chain with consideration of transportation disruption , 2013, Comput. Ind. Eng..
[5] M. A. Hoque,et al. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..
[6] Ruhul A. Sarker,et al. AN INVENTORY RECOVERY MODEL FOR AN ECONOMIC LOT SIZING PROBLEM WITH DISRUPTION , 2016 .
[7] L. Ouyang,et al. An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .
[8] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[9] S. Deshmukh,et al. Coordinated supply management: review, insights, and limitations , 2009 .
[10] Biswajit Sarkar,et al. Joint Inventory and Pricing Policy for an Online to Offline Closed-Loop Supply Chain Model with Random Defective Rate and Returnable Transport Items , 2019, Mathematics.
[11] M. N. A. Rahman,et al. The implementation of cleaner production practices from Malaysian manufacturers' perspectives , 2015 .
[12] Shine-Der Lee,et al. Joint production and shipment lot sizing for a delivery price-based production facility , 2013 .
[13] M. Mukhtar,et al. AN INVENTORY MODEL WITH REWORKING AND SETUP TIME TO CONSIDER EFFECT OF INFLATION AND TIME VALUE OF MONEY , 2016 .
[14] B. R. Sarker,et al. Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system , 2010, J. Oper. Res. Soc..
[15] M. A. Rahman,et al. A STUDY ON LEAN MANUFACTURING IMPLEMENTATION IN MALAYSIAN AUTOMOTIVE COMPONENT INDUSTRY , 2014 .
[16] Jalal Ashayeri,et al. Multi-level inventory management decisions with transportation cost consideration , 2010 .
[17] Biswajit Sarkar,et al. A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate , 2019, Mathematics.
[18] Chairul Saleh,et al. Incorporating logistic costs into a single vendor–buyer JELS model , 2016 .
[19] Michael Godfrey,et al. Incorporating transportation costs into inventory replenishment decisions , 2002 .
[20] Namhun Kim,et al. Effects of variable production rate on quality of products in a single-vendor multi-buyer supply chain management , 2018, The International Journal of Advanced Manufacturing Technology.
[21] C. Carter,et al. JIT purchasing and performance: an exploratory analysis of buyer and supplier perspectives , 2001 .
[22] C. Glock. The joint economic lot size problem: A review , 2012 .
[23] Chairul Saleh,et al. Total cost reduction using a genetic algorithm for multi-vendor and single manufacturer , 2015 .
[24] M. Darwish,et al. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..
[25] Shine-Der Lee,et al. Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost , 2014 .
[26] B. Sarkar,et al. Effect of variable transportation and carbon emission in a three-echelon supply chain model , 2016 .
[27] S. Disney,et al. THE IMPACT OF VENDOR MANAGED INVENTORY ON TRANSPORT OPERATIONS , 2003 .
[28] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[29] Eric Sucky,et al. Inventory management in supply chains: A bargaining problem , 2005 .
[30] Biswajit Sarkar,et al. Manufacturing quality improvement and setup cost reduction in a vendor-buyer supply chain model , 2017 .
[31] Baba Md Deros,et al. Application of Lean Six Sigma Tools for Cycle Time Reduction in Manufacturing: Case Study in Biopharmaceutical Industry , 2014 .
[32] DaeSoo Kim,et al. Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return , 2012 .
[33] Biswajit Sarkar,et al. Sustainable Lot Size in a Multistage Lean-Green Manufacturing Process under Uncertainty , 2018 .
[34] Arshinder,et al. Supply chain coordination: Perspectives, empirical studies and research directions , 2008 .
[35] Sila Çetinkaya,et al. A note on "quality improvement and setup reduction in the joint economic lot size model" , 2007, Eur. J. Oper. Res..
[36] Xiaofei Xu,et al. INCORPORATING TRANSPORTATION COSTS INTO JIT LOT SPLITTING DECISIONS FOR COORDINATED SUPPLY CHAINS , 2006 .
[37] M. Javad Paknejad,et al. Quality improvement and setup reduction in the joint economic lot size model , 2002, Eur. J. Oper. Res..
[38] Noraida Azura Md Darom,et al. An inventory model of supply chain disruption recovery with safety stock and carbon emission consideration , 2018, Journal of Cleaner Production.
[39] Prafulla Joglekar. Note-Comments on A Quantity Discount Pricing Model to Increase Vendor Profits , 1988 .
[40] Fatih Mutlu,et al. An Integrated Model for Stock Replenishment and Shipment Scheduling Under Common Carrier Dispatch Costs , 2010 .
[41] M. RoseA.N.,et al. A Study on Lean Manufacturing Implementation in Malaysian Automotive Component Industry , 2013 .