An efficient method for scheduling construction projects with resource constraints
暂无分享,去创建一个
[1] M M Nkasu. COMSARS: a computer-sequencing approach to multiresource-constrained scheduling: Part 1: Deterministic networks , 1994 .
[2] Eric Johansen. Hard or soft: Planning on medium size construction projects , 1995 .
[3] Colin E. Bell,et al. A new heuristic solution method in resource‐constrained project scheduling , 1991 .
[4] Osama Moselhi,et al. Near optimal solution for resource-constrained scheduling problems , 1993 .
[5] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[6] Bruce M. Woodworth,et al. Identifying the critical sequence in a resource constrained project , 1988 .
[7] Huan Neng Chiu,et al. Two heuristics for scheduling multiple projects with resource constraints , 1996 .
[8] Tzvi Raz,et al. Effect of resource constraints on float calculations in project networks , 1996 .
[9] Elsayed A. Elsayed,et al. Heuristics for resource-constrained scheduling† , 1986 .
[10] F. F. Boctor,et al. Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .
[11] Gündüz Ulusoy,et al. Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling , 1989 .
[12] Peter Williams,et al. Construction planning, programming, and control , 1998 .
[13] Rainer Kolisch,et al. Efficient priority rules for the resource-constrained project scheduling problem , 1996 .