Multiple work zone strategy for repetitive on-site work of modular construction using parallel station method

Modular construction offers benefits such as high quality, low cost, and short durations owing to the high productivity of repetitive production. To maximize productivity, modular construction invo...

[1]  Pandelis G. Ipsilandis,et al.  Multiobjective optimization in Linear Repetitive Project scheduling , 2006, Oper. Res..

[2]  Armin Scholl,et al.  A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..

[3]  Richard Neale,et al.  CPM/LOB: New Methodology to Integrate CPM and Line of Balance , 1994 .

[4]  Ron Wakefield,et al.  Drivers, constraints and the future of offsite manufacture in Australia , 2007 .

[5]  Na Lu,et al.  The Current Use of Offsite Construction Techniques in the United States Construction Industry , 2009 .

[6]  Alistair G.F. Gibb,et al.  Constraints to the Use of Off-site Production on Construction Projects , 2005 .

[7]  R. Mark Lawson,et al.  Application of Modular Construction in High-Rise Buildings , 2012 .

[8]  Minhyuk Jung,et al.  Construction worker hoisting simulation for sky-lobby lifting system , 2017 .

[9]  Khaled A El-Rayes,et al.  Scheduling of repetitive projects with cost optimization , 1993 .

[10]  I-Tung Yang,et al.  Repetitive Scheduling Method: Requirements, Modeling, and Implementation , 2016 .

[11]  O. Shaked,et al.  CONSCHED : expert system for scheduling of modular construction projects , 1992 .

[12]  Khaled Nassar,et al.  Evolutionary Optimization of Resource Allocation in Repetitive Construction Schedules , 2005, J. Inf. Technol. Constr..

[13]  Pandelis G. Ipsilandis,et al.  Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects , 2007 .

[14]  Rehab Reda,et al.  RPM: Repetitive Project Modeling , 1990 .

[15]  Osama Moselhi,et al.  Multi-objective optimization for repetitive scheduling under uncertainty , 2019, Engineering, Construction and Architectural Management.

[16]  Ming Zhou,et al.  A parallel station heuristic for the mixed-model production line balancing problem , 1997 .

[17]  David W. Johnston,et al.  Application of Linear Scheduling , 1986 .

[18]  Onur Behzat Tokdemir,et al.  CHALLENGES IN LINE-OF-BALANCE SCHEDULING , 2002 .

[19]  Peter A. Pinto,et al.  Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations , 1981 .

[20]  Al-HusseinMohamed,et al.  Post simulation visualization model for effective scheduling of modular building construction11This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management. , 2012 .

[21]  Mohamed Al-Hussein,et al.  Post simulation visualization for effective scheduling of modular building construction , 2011 .

[22]  Khaled A El-Rayes,et al.  Optimizing Resource Utilization for Repetitive Construction Projects , 2001 .

[23]  Mary E. Kurz,et al.  Mixed model line balancing with parallel stations, zoning constraints, and ergonomics , 2017, Constraints.

[24]  Nur Evin Özdemirel,et al.  Assembly line balancing with station paralleling , 2009, Comput. Ind. Eng..

[25]  Karl Inderfurth,et al.  Planning and control of rework in the process industries: A review , 2002 .

[26]  Feniosky Peña-Mora,et al.  Hybrid System Dynamics and Discrete Event Simulation for Construction Management , 2007 .

[27]  Rafael Sacks,et al.  Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities , 2008 .

[28]  Mohamed Al-Hussein,et al.  Simulation of modular building construction , 2008, 2008 Winter Simulation Conference.

[29]  Shu-Cherng Fang,et al.  Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration , 2017 .

[30]  Simaan M. AbouRizk,et al.  Off-Site Construction Planning Using Discrete Event Simulation , 2012 .

[31]  Robert I. Carr,et al.  Planning Construction of Repetitive Building Units , 1974 .

[32]  Simaan M. AbouRizk,et al.  Simulation-Based Multiagent Approach for Scheduling Modular Construction , 2014, J. Comput. Civ. Eng..

[33]  Mohamed Al-Hussein,et al.  Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management , 2012 .

[34]  Daniel W. Halpin,et al.  State of the art in construction simulation , 1992, WSC '92.

[35]  Khaled A El-Rayes,et al.  Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost , 2018 .

[36]  Uğur Özcan,et al.  Balancing and scheduling tasks in parallel assembly lines with sequence-dependent setup times , 2019, International Journal of Production Economics.

[37]  Su-Ling Fan,et al.  GA optimization model for repetitive projects with soft logic , 2012 .

[38]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[39]  Donghoon Lee,et al.  Time reduction effect of the enhanced TACT method for high-rise residential buildings , 2015 .