장대레일 신축이음매 재설정에 관한 연구

This research increases efficiency of track-maintenance repair and cuts maintenance cost with relocating Continuous Welded Rail how to set up install criteria by comprehension analysis through an on-the-spot survey and track measurement about installing place at expansion joint of Continuous Welded Rail. This scope of this research is 427 places installed at Line No.1~4, Seoulmetro. We take a field study and select two spots. So we survey wheel-load, cross-load and railbed cross-resistance and suggest install criteria of expansion joint of Continuous Welded Rail through investigation and analysis of track facilities about neighboring section of expansion joint.