Modelling building construction durations

Purpose – This paper aims to develop a multivariate model that will be applicable to the Nigeria construction industry. Design/methodology/approach – A self-administered questionnaire survey was used to source information on project scope factors and qualitative factors considered in the study. Principal component regression was used for data analysis and model development, using SPSS 16.0 for windows, while T-test was used for model testing and validation. Findings – The study found that delay in progress payment by owner, lateness in revising and approving design document by owner, delay in delivering the site to the contractor by the owner, change order by owner during construction, complexity of project design, poor site management and supervision by contractors, and rain effect on construction activities are qualitative/non-project scope factors with good predictive abilities. Research limitations/implications – Cost, gross floor area and number of floors were the only quantitative/project scope fact...

[1]  Raymond Nkado Construction time-influencing factors: the contractor's perspective , 1995 .

[2]  Albert P.C. Chan Modelling building durations in Hong Kong , 1999 .

[3]  Paul D Jeanne Ellis Ormrod Leedy,et al.  Practical Research: Planning and Design , 1974 .

[4]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[5]  Derek H.T. Walker,et al.  An investigation into construction time performance , 1995 .

[6]  Vernon Ireland,et al.  The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .

[7]  Mohan M. Kumaraswamy,et al.  Modelling and predicting construction durations in Hong Kong public housing , 1999 .

[8]  S. Thomas Ng,et al.  Forecast models for actual construction time and cost , 2003 .

[9]  Bryan Christopher Que INCORPORATING PRACTICABILITY INTO GENETIC ALGORITHM-BASED TIME-COST OPTIMIZATION , 2002 .

[10]  David J. Edwards,et al.  Time-cost relationships in Australian building construction projects , 2005 .

[11]  Daniel W.M. Chan,et al.  BENCHMARKING PROJECT CONSTRUCTION TIME PERFORMANCE - THE CASE OF HONG KONG , 2002 .

[12]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[13]  Andrew D.F. Price,et al.  Relationship between value and duration for construction projects , 1991 .

[14]  Andy P. Field,et al.  Discovering Statistics Using SPSS , 2000 .

[15]  Wei Tong Chen,et al.  Approximately predicting the cost and duration of school reconstruction projects in Taiwan , 2006 .

[16]  Mohan M. Kumaraswamy,et al.  A study of the factors affecting construction durations in Hong Kong , 1995 .

[17]  Ka Chi Lam,et al.  The predictive ability of Bromilow's timecost model , 2001 .

[18]  Andrew D.F. Price,et al.  Modelling standard cost commitment curves for contractors' cash flow forecasting , 1993 .

[19]  Andy Field,et al.  Discovering statistics using SPSS, 2nd ed. , 2005 .

[20]  Mohan M. Kumaraswamy,et al.  Forecasting construction durations for public housing projects: a Hong Kong perspective , 1999 .

[21]  D. R. Ogunsemi,et al.  Time‐cost model for building projects in Nigeria , 2006 .

[22]  Alfred E. Thal,et al.  Estimating Performance Time for Construction Projects , 2007 .

[23]  T. Sincich,et al.  Statistics for business and economics , 1978 .