Modelling building construction durations
暂无分享,去创建一个
[1] Raymond Nkado. Construction time-influencing factors: the contractor's perspective , 1995 .
[2] Albert P.C. Chan. Modelling building durations in Hong Kong , 1999 .
[3] Paul D Jeanne Ellis Ormrod Leedy,et al. Practical Research: Planning and Design , 1974 .
[4] Garold D. Oberlender,et al. Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .
[5] Derek H.T. Walker,et al. An investigation into construction time performance , 1995 .
[6] Vernon Ireland,et al. The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .
[7] Mohan M. Kumaraswamy,et al. Modelling and predicting construction durations in Hong Kong public housing , 1999 .
[8] S. Thomas Ng,et al. Forecast models for actual construction time and cost , 2003 .
[9] Bryan Christopher Que. INCORPORATING PRACTICABILITY INTO GENETIC ALGORITHM-BASED TIME-COST OPTIMIZATION , 2002 .
[10] David J. Edwards,et al. Time-cost relationships in Australian building construction projects , 2005 .
[11] Daniel W.M. Chan,et al. BENCHMARKING PROJECT CONSTRUCTION TIME PERFORMANCE - THE CASE OF HONG KONG , 2002 .
[12] N. Kartam,et al. Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .
[13] Andrew D.F. Price,et al. Relationship between value and duration for construction projects , 1991 .
[14] Andy P. Field,et al. Discovering Statistics Using SPSS , 2000 .
[15] Wei Tong Chen,et al. Approximately predicting the cost and duration of school reconstruction projects in Taiwan , 2006 .
[16] Mohan M. Kumaraswamy,et al. A study of the factors affecting construction durations in Hong Kong , 1995 .
[17] Ka Chi Lam,et al. The predictive ability of Bromilow's timecost model , 2001 .
[18] Andrew D.F. Price,et al. Modelling standard cost commitment curves for contractors' cash flow forecasting , 1993 .
[19] Andy Field,et al. Discovering statistics using SPSS, 2nd ed. , 2005 .
[20] Mohan M. Kumaraswamy,et al. Forecasting construction durations for public housing projects: a Hong Kong perspective , 1999 .
[21] D. R. Ogunsemi,et al. Time‐cost model for building projects in Nigeria , 2006 .
[22] Alfred E. Thal,et al. Estimating Performance Time for Construction Projects , 2007 .
[23] T. Sincich,et al. Statistics for business and economics , 1978 .