Minimizing maximum lateness in a flow shop subject to release dates
暂无分享,去创建一个
[1] Ali Allahverdi,et al. No-wait flowshops with bicriteria of makespan and maximum lateness , 2004, Eur. J. Oper. Res..
[2] Fawaz S. Al-Anzi,et al. Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications , 2002, Comput. Oper. Res..
[3] Paul Stephenson,et al. A computational study with a new algorithm for the three-machine permutation flow-shop problem with release times , 2001, Eur. J. Oper. Res..
[4] J. Grabowski,et al. On Flow Shop Scheduling with Release and Due Dates to Minimize Maximum Lateness , 1983 .
[5] Leslie A. Hall,et al. A Polynomial Approximation Scheme for a Constrained Flow-Shop Scheduling Problem , 1994, Math. Oper. Res..
[6] Mikhail Y. Kovalyov,et al. A polynomial approximation scheme for problem F2/rj/Cmax , 1997, Oper. Res. Lett..
[7] Eugene L. Lawler,et al. Sequencing and scheduling: algorithms and complexity , 1989 .
[8] Jacques Carlier,et al. Scheduling jobs with release dates and tails on identical machines to minimize the makespan , 1987 .
[9] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[10] Talel Ladhari,et al. Minimising maximum lateness in a two-machine flowshop , 2000, J. Oper. Res. Soc..
[11] W. A. Horn. Some simple scheduling algorithms , 1974 .
[12] J. Carlier,et al. Two branch and bound algorithms for the permutation flow shop problem , 1996 .
[13] Chris N. Potts,et al. An adaptive branching rule for the permutation flow-shop problem , 1980 .
[14] A. Kan. Machine Scheduling Problems: Classification, Complexity and Computations , 1976 .
[15] Paul Stephenson,et al. Fast algorithms to minimize the makespan or maximum lateness in the two‐machine flow shop with release times , 2002 .
[16] C. N. Potts. Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates , 1985, Math. Oper. Res..
[17] Mohamed Haouari,et al. Minimizing makespan on parallel machines subject to release dates and delivery times , 2002 .
[18] Fawaz S. Al-Anzi,et al. Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm , 2006 .