Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and imposed a high degree of uncertainty to the mine planning procedure while none of the existent algorithms of the pit limit determination consider the metal price uncertainty. Real Option Approach (ROA) is an efficient method of decision making in the condition of uncertainty. This approach usually used for evaluation of defined natural resources projects up to now. This study considering the metal price uncertainty used real option approach to prepare a methodology for determining the Ultimate Pit Limits (UPL). The study was carried out on a nonferrous metallic cylindrical ore deposit but the achieved methodology can be adjusted for all kinds of the deposits. The achieved methodology was comprehensively described through the examples in a way that can be used by the mine planners.

[1]  R. Litzenberger,et al.  Backwardation in Oil Futures Markets: Theory and Empirical Evidence , 1995 .

[2]  Donald F. Larson,et al.  Uncertainty and the convenience yield in crude oil price backwardations , 2001 .

[3]  A Akbari,et al.  An updated and modified O’Hara cost estimating model based on World and Iran economic conditions , 2005 .

[4]  S. Suslick,et al.  Estimating the volatility of mining projects considering price and operating cost uncertainties , 2006 .

[5]  R. Dimitrakopoulos,et al.  Managing risk and waste mining in long-term production scheduling of open-pit mines , 2004 .

[6]  LINEAR PROGRAMMING APPROACH TO MINE SCHEDULING OPTIMIZATION. , 1982 .

[7]  Mark Gershon Heuristic approaches for mine planning and production scheduling , 1987 .

[8]  P Huttagosol,et al.  A computer design of ultimate pit limit by using transportation algorithm. , 1992 .

[9]  Brian D. Wright,et al.  Storage and commodity markets: Acknowledgments , 1991 .

[10]  Roussos Dimitrakopoulos,et al.  Evaluating mine plans under uncertainty: Can the real options make a difference? , 2007 .

[11]  Damian Schofield,et al.  Inclusion of risk assessment in open-pit design and scheduling , 1995 .

[12]  J. Picard Maximal Closure of a Graph and Applications to Combinatorial Problems , 1976 .

[13]  Richard L. Shockley An Applied Course in Real Options Valuation , 2006 .

[14]  L. M. Giannini Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.

[15]  A. Deaton,et al.  Competitive Storage and Commodity Price Dynamics , 1996, Journal of Political Economy.

[16]  Marcus J. Chambers,et al.  A Theory of Commodity Price Fluctuations , 1996, Journal of Political Economy.

[17]  Marco Antonio Guimarães Dias,et al.  Valuation of exploration and production assets: an overview of real options models , 2004 .