The Role of Systems Thinking in Systems Engineering, Design and Management
暂无分享,去创建一个
[1] Weng Tat Chan,et al. Developing a Construction Safety Management System , 2011, Modeling Risk Management in Sustainable Construction.
[2] Hao Hu,et al. An application of genetic algorithms to precast production scheduling , 2001 .
[3] Weng Tat Chan,et al. Optimal Fund-Allocation Analysis for Multidistrict Highway Agencies , 2003 .
[4] Weng Tat Chan,et al. Rescheduling Precast Production with Multiobjective Optimization , 2005 .
[5] Mark C. Paulk,et al. The Capability Maturity Model , 1991 .
[6] Weng Tat Chan,et al. Constraint handling methods in pavement maintenance programming , 2001 .
[7] Weng Tat Chan,et al. Constraint Programming Approach to Precast Production Scheduling , 2002 .
[8] Weng Tat Chan,et al. CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .
[9] Weng Tat Chan,et al. Road-maintenance planning using genetic algorithms. I: Formulation , 1994 .
[10] Weng Tat Chan,et al. Coordinated production scheduling of prefabricated building components , 2003 .