URBAN PUBLIC TRANSIT SYSTEMS MODELING CAPABILITIES
暂无分享,去创建一个
[1] P Gower,et al. USER GUIDE TO CONTRAM VERSION 4 , 1982 .
[2] Kethireddipalli Srinivas Rao. Fuel consumption model for FREFLO , 1992 .
[3] P Gower,et al. CONTRAM, STRUCTURE OF THE MODEL , 1989 .
[4] Geoffrey J H Brown,et al. MICRO-ASSIGNMENT: A NEW TOOL FOR SMALL-AREA PLANNING , 1970 .
[5] D I Robertson,et al. TRANSYT: A TRAFFIC NETWORK STUDY TOOL , 1969 .
[6] Palathinkal Manu Isaac. Evaluation of a nodal capacity restricted dynamic model for the Southwest Freeway (US-59) corridor in Houston, Texas , 1994 .
[7] P R Cornwell,et al. Design for public transport , 1984 .
[8] J Y Luk,et al. TRANSYT: traffic network study tool , 1990 .
[9] L G Willumsen,et al. SATURN - A SIMULATION-ASSIGNMENT MODEL FOR THE EVALUATION OF TRAFFIC MANAGEMENT SCHEMES , 1980 .
[10] P C Baguley,et al. CONTRAM: A TRAFFIC ASSIGNMENT MODEL FOR PREDICTING FLOWS AND QUEUES DURING PEAK PERIODS , 1978 .
[11] Dmw Logie. TRAFFICQ: A COMPREHENSIVE MODEL FOR TRAFFIC MANAGEMENT SCHEMES , 1979 .
[12] Map Taylor. SMALL AREA TRAFFIC ANALYSIS USING THE LATM PACKAGE , 1978 .