A Blackboard Architecture for Integrating Process Planning and Production Scheduling
暂无分享,去创建一个
Norman Sadeh | David W. Hildum | Dag Kjenstad | Allen Tseng | Thomas J. Laliberty | John McA'Nulty | N. Sadeh | Dag Kjenstad | A. Tseng | J. McA'Nulty
[1] Biren Prasad,et al. Towards a Computer-Supported Cooperative Environment for Concurrent Engineering , 1997 .
[2] Joseph Harrington,et al. Computer integrated manufacturing , 1973 .
[3] Stephen F. Smith,et al. Viewing scheduling as an opportunistic problem-solving process , 1988 .
[4] Behrokh Khoshnevis,et al. Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..
[5] Austin Tate,et al. O-Plan: The open Planning Architecture , 1991, Artif. Intell..
[6] R. Nagel,et al. Agile Competitors and Virtual Organizations: Strategies for Enriching the Customer , 1994 .
[7] Linda J. Lapointe,et al. DICE MO-a collaborative DFMA analysis tool , 1994, Proceedings of 3rd IEEE Workshop on Enabling Technologies: Infrastructure for Collaborative Enterprises.
[8] Samuel H. Huang,et al. A progressive approach for the integration of process planning and scheduling , 1995 .
[9] Hau L. Lee. Managing supply chain inventory: Pitfalls and opportunities , 1992 .
[10] David W. Hildum. Flexibility in a Knowledge-Based System for Solving Dynamic Resource-Constrained Scheduling Problems , 1994 .
[11] H. Penny Nii,et al. Blackboard Systems, Part One: The Blackboard Model of Problem Solving and the Evolution of Blackboard Architectures , 1986, AI Mag..
[12] D. Corkill. Blackboard Systems , 1991 .
[13] John S. Edwards. Knowledge-Based Manufacturing Management , 1992 .
[14] Victor Lesser,et al. The Evolution of Blackboard Control Architectures , 1992 .
[15] Rüdiger Dillmann,et al. Computer-Aided Design and Manufacturing , 1986, Symbolic Computation.
[16] Edward A. Feigenbaum,et al. Signal-to-Symbol Transformation: HASP/SIAP Case Study , 1982, AI Mag..
[17] Will Earhart. In Pittsburgh, PA. , 1929 .
[18] Norman M. Sadeh. Micro-Boss: Dual-use ARPI scheduling technology helps improve manufacturing performance , 1995 .
[19] K. Srinivasan,et al. Impact of Electronic Data Interchange Technology on JIT Shipments , 1994 .
[20] Victor R. Lesser,et al. The Distributed Vehicle Monitoring Testbed: A Tool for Investigating Distributed Problem Solving Networks , 1983, AI Mag..
[21] Guangleng Xiong,et al. Concurrent engineering research and application , 1999 .
[22] Mark Stefik,et al. Planning with Constraints (MOLGEN: Part 1) , 1981, Artif. Intell..
[23] Norman Sadeh,et al. MICRO-OPPORTUNISTIC SCHEDULING THE MICRO-BOSS FACTORY SCHEDULER , 1994 .
[24] Victor R. Lesser,et al. The Hearsay-II Speech-Understanding System: Integrating Knowledge to Resolve Uncertainty , 1980, CSUR.
[25] Barbara Hayes-Roth,et al. Modeling Planning as an Incremental, Opportunistic Process , 1979, IJCAI.
[26] Hong-Chao Zhang,et al. An integrated model of process planning and production scheduling , 1994 .
[27] Barbara Hayes-Roth,et al. A Cognitive Model of Planning , 1979, Cogn. Sci..