A Blackboard Architecture for Integrating Process Planning and Production Scheduling

As companies attempt to increase customization levels in their product offerings, move toward smaller lot production, and experi ment with more flexible customer/supplier arrangements such as those made possible by electronic data interchange (EDI), they increas ingly require the ability to (1) respond quickly, accurately, and competitively to customer requests for bids on new or modified products and (2) efficiently work out supplier/subcontractor arrangements for these products This in turn requires the ability to (1) rapidly convert standard-based product specifications into process plans and (2) quickly integrate process plans for new orders into the existing production schedule to best accommodate the current state of the manufacturing enterprise

[1]  Biren Prasad,et al.  Towards a Computer-Supported Cooperative Environment for Concurrent Engineering , 1997 .

[2]  Joseph Harrington,et al.  Computer integrated manufacturing , 1973 .

[3]  Stephen F. Smith,et al.  Viewing scheduling as an opportunistic problem-solving process , 1988 .

[4]  Behrokh Khoshnevis,et al.  Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..

[5]  Austin Tate,et al.  O-Plan: The open Planning Architecture , 1991, Artif. Intell..

[6]  R. Nagel,et al.  Agile Competitors and Virtual Organizations: Strategies for Enriching the Customer , 1994 .

[7]  Linda J. Lapointe,et al.  DICE MO-a collaborative DFMA analysis tool , 1994, Proceedings of 3rd IEEE Workshop on Enabling Technologies: Infrastructure for Collaborative Enterprises.

[8]  Samuel H. Huang,et al.  A progressive approach for the integration of process planning and scheduling , 1995 .

[9]  Hau L. Lee Managing supply chain inventory: Pitfalls and opportunities , 1992 .

[10]  David W. Hildum Flexibility in a Knowledge-Based System for Solving Dynamic Resource-Constrained Scheduling Problems , 1994 .

[11]  H. Penny Nii,et al.  Blackboard Systems, Part One: The Blackboard Model of Problem Solving and the Evolution of Blackboard Architectures , 1986, AI Mag..

[12]  D. Corkill Blackboard Systems , 1991 .

[13]  John S. Edwards Knowledge-Based Manufacturing Management , 1992 .

[14]  Victor Lesser,et al.  The Evolution of Blackboard Control Architectures , 1992 .

[15]  Rüdiger Dillmann,et al.  Computer-Aided Design and Manufacturing , 1986, Symbolic Computation.

[16]  Edward A. Feigenbaum,et al.  Signal-to-Symbol Transformation: HASP/SIAP Case Study , 1982, AI Mag..

[17]  Will Earhart In Pittsburgh, PA. , 1929 .

[18]  Norman M. Sadeh Micro-Boss: Dual-use ARPI scheduling technology helps improve manufacturing performance , 1995 .

[19]  K. Srinivasan,et al.  Impact of Electronic Data Interchange Technology on JIT Shipments , 1994 .

[20]  Victor R. Lesser,et al.  The Distributed Vehicle Monitoring Testbed: A Tool for Investigating Distributed Problem Solving Networks , 1983, AI Mag..

[21]  Guangleng Xiong,et al.  Concurrent engineering research and application , 1999 .

[22]  Mark Stefik,et al.  Planning with Constraints (MOLGEN: Part 1) , 1981, Artif. Intell..

[23]  Norman Sadeh,et al.  MICRO-OPPORTUNISTIC SCHEDULING THE MICRO-BOSS FACTORY SCHEDULER , 1994 .

[24]  Victor R. Lesser,et al.  The Hearsay-II Speech-Understanding System: Integrating Knowledge to Resolve Uncertainty , 1980, CSUR.

[25]  Barbara Hayes-Roth,et al.  Modeling Planning as an Incremental, Opportunistic Process , 1979, IJCAI.

[26]  Hong-Chao Zhang,et al.  An integrated model of process planning and production scheduling , 1994 .

[27]  Barbara Hayes-Roth,et al.  A Cognitive Model of Planning , 1979, Cogn. Sci..