Simulation of a VAV air conditioning system in an existing building for the cooling mode

Abstract In this study, simulation of a variable air volume (VAV) air conditioning system in an existing office building is presented for the cooling mode. A building simulation package was used for the simulation [DOE, EnergyPlus Engineering Document, Version 1.3., U.S. Department of Energy, Washington, DC, 2005]. The design information of the existing office building, the actual number of the internal load sources such as occupants, lighting, office equipments and the manufacturer's data for the existing rooftop unit (RTU) and the VAV boxes were used in the building simulation package. The simulation results; RTU power consumption, indoor zone temperature and relative humidity, were validated with the data obtained from the on-site measurements performed in the existing office building under the same outdoor conditions. It was found that 71.1% of all simulated power consumption data falls within ±15% range from the experimental data. The reason for the existence of some data out of band is due to the possible errors associated with the difference in the solar data used for the location 40 km away from the experimental location. It was found that 90.6–94.7% of the indoor temperature experimental data fall within ±1.5 °C range from the simulated data, and 88.3–91.3% of the indoor relative humidity data fall within ±18% range from the simulated data.

[1]  Vice President,et al.  AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS INC. , 2007 .

[2]  M. Zaheer-uddin,et al.  Dynamic simulation of energy management control functions for HVAC systems in buildings , 2006 .

[3]  D. Westphalen,et al.  New Approach to Energy Savings For Rooftop AC , 2004 .

[4]  M. H. Hosni,et al.  Experimental results for heat gain and radiant/convective split from equipment in buildings , 1999 .

[5]  Yiqun Pan,et al.  Measurement and simulation of indoor air quality and energy consumption in two Shanghai office buildings with variable air volume systems , 2003 .

[6]  Radu Zmeureanu Prediction of the cop of existing rooftop units using artificial neural networks and minimum number of sensors , 2002 .

[7]  Reinhard Radermacher,et al.  Simulation Evaluation of the Ventilation Effect on the Performance of a VRV System in Cooling Mode—Part II, Simulation Evaluation , 2008 .

[8]  S. C. Sekhar,et al.  Energy simulation approach to air-conditioning system evaluation , 1998 .

[9]  Dennis Johansson,et al.  Optimal supply air temperature with respect to energy use in a variable air volume system , 2004 .

[10]  J. E. Janssen,et al.  Ventilation for acceptable indoor air quality , 1989 .

[11]  S. C. Sekhar,et al.  A critical evaluation of variable air volume system in hot and humid climates , 1997 .

[12]  B. W. Jones,et al.  Total heat gain and the split between radiant and convective heat gain from office and laboratory equipment in buildings , 1998 .

[13]  Che-Ming Chiang,et al.  Performance evaluation of an innovative fan-coil unit: Low-temperature differential variable air volume FCU , 2007 .

[14]  Weiwei Liu,et al.  Evaluation program for the energy-saving of variable-air-volume systems , 2007 .

[15]  Ruzhu Wang,et al.  Energy simulation in the variable refrigerant flow air-conditioning system under cooling conditions , 2007 .

[16]  N. Eskin,et al.  Analysis of annual heating and cooling energy requirements for office buildings in different climates in Turkey , 2008 .

[17]  Nabil Nassif,et al.  A new operating strategy for economizer dampers of VAV system , 2008 .

[18]  Shui Yuan,et al.  Multiple-zone ventilation and temperature control of a single-duct VAV system using model predictive strategy , 2006 .

[19]  K. H. Yang,et al.  An innovative analysis and experimental investigation on energy savings of a VAV system in hot and humid climates , 2000 .

[20]  Masaaki Terano,et al.  Field experiments on energy consumption and thermal comfort in the office environment controlled by occupants’ requirements from PC terminal , 2007 .