Transmission planning under uncertainty: A two-stage stochastic modelling approach

We develop a stochastic two-stage modelling approach to capture the multistage nature of the electricity transmission planning problem and apply it to a stylised representation of the Great Britain (GB) transmission network. In our model, a proactive transmission planner makes investment decisions in two time periods, each time followed by a market response. In the second period, there is less uncertainty than in the first, as the planner knows which of the scenarios has been realized, but the set of options open to the planner in the second period is constrained by the first-period decisions. This model allows us to estimate the value of information in transmission planning, the costs of ignoring uncertainty and the option value of transmission investment alternatives. Our results show that ignoring risk has quantifiable economic consequences and that there is a quantifiable value of optionality.

[1]  G. Sinden Characteristics of the UK wind resource: Long-term patterns and relationship to electricity demand , 2007 .

[2]  S. Lauria,et al.  A new methodology for power systems flexibility evaluation , 2005, 2005 IEEE Russia Power Tech.

[3]  Feng Gao,et al.  Overview of transmission expansion planning using real options analysis , 2005 .

[4]  Andreas Ehrenmann,et al.  Space and Time: Wind in an Investment Planning Model , 2006 .

[5]  H. M. Merrill,et al.  Conflicting objectives and risk in power system planning , 1993 .

[6]  Xiao-Ping Zhang,et al.  Using Market Simulations for Economic Assessment of Transmission Upgrades: Application of the California ISO Approach , 2010 .

[7]  S. Oren,et al.  Proactive planning and valuation of transmission investments in restructured electricity markets , 2006 .

[8]  S. Binato,et al.  Value-Based Transmission Expansion Planning of Hydrothermal Systems Under Uncertainty , 2007, IEEE Transactions on Power Systems.

[9]  Vladimir Parail,et al.  Can Merchant Interconnectors Deliver Lower and More Stable Prices? The Case of NorNed , 2009 .

[10]  M. Shahidehpour,et al.  Market-Based Generation and Transmission Planning With Uncertainties , 2009, IEEE Transactions on Power Systems.

[11]  Maria Carmen Falvo,et al.  Power system planning under uncertainty conditions. criteria for transmission network flexibility evaluation , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.

[12]  M. Shahidehpour,et al.  Market based transmission planning under uncertainties , 2005, 2004 International Conference on Probabilistic Methods Applied to Power Systems.

[13]  J. W. Feltes,et al.  Deregulation, privatization, and competition: transmission planning under uncertainty , 1999 .

[14]  A. Conejo,et al.  A Bilevel Approach to Transmission Expansion Planning Within a Market Environment , 2009, IEEE Transactions on Power Systems.

[15]  Karsten Neuhoff,et al.  Modelling Wind in the Electricity Sector , 2007 .