An integrated and improved dispatching approach to reduce cycle time of wet etch and furnace operations in semiconductor fabrication

The dispatching rules for the process of wet etch and furnace are complex due to the multiple considerations of waiting time constraints, batch size forming, and load balancing. This paper proposes an effective three-stage approach based on multi-factors selection, integrating developed dispatching rules and LR-ratio method, to decide the most appropriate scheduler and sequencing order. To verify the viability of the proposed approach, we conduct an empirical study based on real data collected in a semiconductor manufacturing. A simulation model is constructed and the proposed method is applied for evaluating its performance. Numerical results show that the developed approach can significantly reduce the cycle time by 8% compared to the existing approach.

[1]  John W. Fowler,et al.  A new scheduling approach using combined dispatching criteria in wafer fabs , 2003 .

[2]  J. Domaschke,et al.  Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations , 2000 .

[3]  C. R. Glassey,et al.  Dynamic batching heuristic for simultaneous processing , 1991 .

[4]  L. Su A hybrid two-stage flowshop with limited waiting time constraints , 2003 .

[5]  Thomas Hofmann,et al.  Unsupervised Learning by Probabilistic Latent Semantic Analysis , 2004, Machine Learning.

[6]  R. Serfozo,et al.  Optimal control of batch service queues , 1973, Advances in Applied Probability.

[7]  John W. Fowler,et al.  Real-time control of multiproduct bulk-service semiconductor manufacturing processes , 1992 .

[8]  B.-J. Joo,et al.  A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints , 2009, J. Oper. Res. Soc..

[9]  Michael I. Jordan,et al.  Latent Dirichlet Allocation , 2001, J. Mach. Learn. Res..

[10]  Thomas Hofmann,et al.  Probabilistic Latent Semantic Analysis , 1999, UAI.

[11]  Li Sheng Chinese Sentence Similarity Computing Based on Semantic Dependency Relationship Analysis , 2003 .

[12]  R. C. Leachman,et al.  An improved methodology for real-time production decisions at batch-process work stations , 1993 .

[13]  Reha Uzsoy,et al.  Alternative loading and dispatching policies for furnace operations in semiconductor manufacturing: a comparison by simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[14]  Peter W. Foltz,et al.  The Measurement of Textual Coherence with Latent Semantic Analysis. , 1998 .

[15]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[16]  Craig H. Martell,et al.  Topic Detection and Extraction in Chat , 2008, 2008 IEEE International Conference on Semantic Computing.

[17]  M. Neuts A General Class of Bulk Queues with Poisson Input , 1967 .

[18]  D. Stein,et al.  Chat and conversation: a case of transmedial stability? , 2004 .