A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site
暂无分享,去创建一个
[1] 김예상. 건설 생산성에 영향을 미치는 요인 분석에 관한 연구 ( Analysis of the Factors Influencing Construction Productivity ) , 1994 .
[2] Harrington Emerson,et al. Motion study : a method for increasing the efficiency of the workman; And, Efficiency as a basis for operation and wages , 1911 .
[3] Sang-Jin Jung,et al. An Experimental Study on Physical Properies of Concrete with Packaged Dry Combined Materials , 2005 .
[4] 서덕석,et al. AHP 를 이용한 작업분석 평가기법에 관한 연구 ( A Study on the Motion Analysis and AHP evaluating method in Construction Works ) , 1997 .
[5] B. W. Niebel,et al. A Case Study on Assembly Line Analysis with MTM , 1980 .