An Optimization Method for the Remanufacturing Dynamic Facility Layout Problem with Uncertainties
暂无分享,去创建一个
[1] Hua Zhang,et al. Development of multi-criteria decision making model for remanufacturing technology portfolio selection , 2011 .
[2] R. Krishnaraj,et al. OPTIMIZATION OF CELLULAR LAYOUT UNDER DYNAMIC DEMAND ENVIRONMENT BY SIMULATED ANNEALING , 2012 .
[3] Shuo Zhu,et al. Optimal Acquisition and Inventory Control for a Remanufacturing System , 2013 .
[4] Renbin Xiao,et al. Enhancing Artificial Bee Colony Algorithm with Self-Adaptive Searching Strategy and Artificial Immune Network Operators for Global Optimization , 2014, TheScientificWorldJournal.
[5] Johan Östlin,et al. Product life-cycle implications for remanufacturing strategies , 2009 .
[6] Ouajdi Korbaa,et al. Intra-cell machine layout associated with flexible production and transport systems , 2003 .
[7] Luk N. Van Wassenhove,et al. Remanufacturing as a Marketing Strategy , 2008, Manag. Sci..
[8] Felix T.S. Chan,et al. Two-stage approach for machine-part grouping and cell layout problems , 2006 .
[9] Reza Tavakkoli-Moghaddam,et al. A multi-objective model for designing a group layout of a dynamic cellular manufacturing system , 2013 .
[10] Chunhua Ju,et al. Simplifying Multiproject Scheduling Problem Based on Design Structure Matrix and Its Solution by an Improved aiNet Algorithm , 2012 .
[11] Gilvan C. Souza,et al. Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly , 2005, Eur. J. Oper. Res..
[12] Reza Tavakkoli-Moghaddam,et al. Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing , 2012, Comput. Oper. Res..
[13] Tinggui Chen,et al. A Dynamic Intelligent Decision Approach to Dependency Modeling of Project Tasks in Complex Engineering System Optimization , 2013 .
[14] Türkay Dereli,et al. An ant colony algorithm for solving budget constrained and unconstrained dynamic facility layout problems , 2006 .
[15] Reza Tavakkoli-Moghaddam,et al. A hybrid simulated annealing algorithm for location and routing scheduling problems with cross-docking in the supply chain , 2013 .
[16] Artak Hakobyan,et al. Heuristics for the dynamic facility layout problem with unequal-area departments , 2010, Eur. J. Oper. Res..
[17] Seyed Taghi Akhavan Niaki,et al. Forecasting S&P 500 index using artificial neural networks and design of experiments , 2013 .
[18] Rui Zhang. A Simulated Annealing-Based Heuristic Algorithm for Job Shop Scheduling to Minimize Lateness , 2013 .
[19] Günther Seliger,et al. Guidelines for the Definition of Innovative Industrial Product-service Systems (PSS) Business Models for Remanufacturing , 2014 .
[20] Orhan Türkbey,et al. A simulated annealing heuristic for the dynamic layout problem with budget constraint , 2010, Comput. Ind. Eng..
[21] Guangdong Tian,et al. Energy evaluation method and its optimization models for process planning with stochastic characteristics: A case study in disassembly decision-making , 2012, Comput. Ind. Eng..
[22] Lingling Li,et al. A Modeling Approach to Analyze Variability of Remanufacturing Process Routing , 2013, IEEE Transactions on Automation Science and Engineering.
[23] Fariborz Jolai,et al. A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach , 2013, Comput. Ind. Eng..
[24] Congbo Li,et al. Uncertainty management in remanufacturing: A review , 2012, 2012 IEEE International Conference on Automation Science and Engineering (CASE).