Stochastic leadtimes in two-level distribution type networks
暂无分享,去创建一个
[1] S. Lakshminarayan,et al. Technical Note - Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties , 1978, Oper. Res..
[2] John J. Kankt,et al. Manufacturing systems with forbidden early order departure , 1984 .
[3] B. W. Taylor,et al. A simulation-based experimental investigation of supply/timing uncertainty in MRP systems , 1984 .
[4] Candace Aria Yano,et al. Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs , 1987 .
[5] K. R. Baker,et al. The Effect of Commonality on Safety Stock in a Simple Inventory Model , 1986 .
[6] D. Clay Whybark,et al. MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .