Probabilistic safety assessment improves surveillance requirements in technical specifications

[1]  Sebastián Salvador Martorell Alsina Análisis de la interacción entre los requisitos de tiempo máximo permitido de inoperabilidad (aot) e intervalo entre pruebas de vigilancia (sti) de componentes de sistemas de seguridad de centrales nucleares , 1992 .

[2]  Sebastian Martorell,et al.  Quantitative evaluation of surveillance test intervals including test-caused risks , 1992 .

[3]  Andrej Senegačnik,et al.  Operating reliability of a conventional power plant , 1992 .

[4]  Stan Uryasev,et al.  Optimization of test strategies: a general approach , 1993 .

[5]  Sebastian Martorell,et al.  Risk analysis of surveillance requirements including their adverse effects , 1994 .

[6]  Homayoon Dezfuli,et al.  Application of REVEAL W™ to risk-based configuration control , 1994 .

[7]  W. E. Vesely,et al.  PRA importance measures for maintenance prioritization applications , 1994 .

[8]  Sebastian Martorell,et al.  Improving allowed outage time and surveillance test interval requirements: a study of their interactions using probabilistic methods , 1995 .

[9]  J. Vaurio Optimization of test and maintenance intervals based on risk and cost , 1995 .

[10]  B. Mavko,et al.  Surveillance test interval optimization , 1995 .

[11]  Sebastian Martorell,et al.  An approach to integrating surveillance and maintenance tasks to prevent the dominant failure causes of critical components , 1995 .

[12]  P. K. Samanta,et al.  Probabilistic analysis of limiting conditions for operation action requirements including risk of shutdown , 1995 .

[13]  Tunc Aldemir,et al.  Optimization of standby safety system maintenance schedules in nuclear power plants , 1996 .