The finite-time-period preventive maintenance policies with failure rate reduction under a warranty consideration

In practice, a system or equipment has a finite useful life. When an aged system is replaced by a new system, the new system seldom has exactly the same characteristics, functions, investment cost, maintenance expenses, etc., as those of the aged system. However, the literature has shown that most researchers are devoted to studying maintenance problems in an infinite time span, which assumes that the replaced system in each replacement cycle (or period) has the same conditions and costs. Apparently, the assumption might not be practical, since the useful operating life of most systems is finite in the real world. Therefore, the purpose of this research is to develop an optimal preventive maintenance (PM) policy having failure rate reduction within a finite time span under a warranty consideration by minimizing the expected total maintenance cost. The PM cost is assumed to be a linear function of each PM effect. Two cases are studied and compared; one is with no warranty provided and the other is with a given warranty period. For the second case, we examine two policies: (1) no PM within the warranty period is assumed and (2) the PM will be performed within the warranty period. In this article, the algorithm for searching the optimal solution is presented. Examples with Weibull failure cases are given and the sensitivity analysis of the optimal solution is also provided.

[1]  Young Ho Chun,et al.  An Algorithm for Preventive Maintenance Policy , 1986, IEEE Transactions on Reliability.

[2]  Dong Ho Park,et al.  Cost minimization for periodic maintenance policy of a system subject to slow degradation , 2000, Reliab. Eng. Syst. Saf..

[3]  George Lindfield,et al.  Numerical Methods Using MATLAB , 1998 .

[4]  Toshio Nakagawa,et al.  Imperfect Preventive-Maintenance , 1979, IEEE Transactions on Reliability.

[5]  Cheng-Kang Chen,et al.  Periodical Preventive-Maintenance Contract for a Leased Facility with Weibull Life-Time , 2006 .

[6]  D. N. Prabhakar Murthy,et al.  Optimal decision making in a maintenance service operation , 1999, Eur. J. Oper. Res..

[7]  J.-K. Chan,et al.  Modeling repairable systems with failure rates that depend on age and maintenance , 1993 .

[8]  D. N. Prabhakar Murthy,et al.  Optimal preventive maintenance of leased equipment with corrective minimal repairs , 2006, Eur. J. Oper. Res..

[9]  David R. Kincaid,et al.  Numerical mathematics and computing , 1980 .

[10]  Toshio Nakagawa,et al.  Optimum Policies When Preventive Maintenance is Imperfect , 1979, IEEE Transactions on Reliability.

[11]  Oleg Martynenko Complex radioelectronic equipment restoration cost optimization , 1993 .

[12]  T. Nakagawa Periodic and sequential preventive maintenance policies , 1986 .

[13]  Ruey Huei Yeh,et al.  Optimal periodic replacement policy for repairable products under free-repair warranty , 2007, Eur. J. Oper. Res..

[14]  D. N. Prabhakar Murthy,et al.  Optimal periodic preventive maintenance policy for leased equipment , 2006, Reliab. Eng. Syst. Saf..

[15]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[16]  V. Jayabalan,et al.  Cost optimization of maintenance scheduling for a system with assured reliability , 1992 .

[17]  D. N. P. Murthy,et al.  Maintenance strategies for used equipment under lease , 2006 .

[18]  Ruey Huei Yeh,et al.  Optimal threshold value of failure-rate for leased products with preventive maintenance actions , 2007, Math. Comput. Model..

[19]  R. V. Canfield,et al.  Cost Optimization of Periodic Preventive Maintenance , 1986, IEEE Transactions on Reliability.