Background analysis for the application of EOQ model in a three-stage steel roller production system with deterministic demands and returns

Facing increasing market competitions, more manufacturers opt to incorporate remanufacturing into their production system in order to alleviate pressures due to increasing raw material price. The management of inventories in the production system becomes more complex when manufacturing and remanufacturing take place simultaneously. It is essential to find a way to decide when remanufacturing should starts and stops at a lower cost. This paper introduces a manufacturing/remanufacturing system with multiple serviceable inventories and multiple recoverable inventories in a steel roller producing process. By considering manufacturing and remanufacturing in the different stages, three modes of production are identified. Then, the inventory profiles in the system are studied to make preparation for the application of EOQ model in the steel roller production process to decide the optimal order quantities and the optimal order time between various serviceable inventories with the view of minimizing the average cost.

[1]  Henry C. Co,et al.  A note on the problem of scheduling a flexible manufacturing system for Just-in-time customers , 1995 .

[2]  R. Teunter Economic ordering quantities for recoverable item inventory systems , 2001 .

[3]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[4]  Benita M. Beamon,et al.  Supply-chain network configuration for product recovery , 2004 .

[5]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[6]  Leroy B. Schwarz Economic Order Quantities for Products with Finite Demand Horizons , 1972 .

[7]  Reha Uzsoy,et al.  A single-product network design model with lead time and safety stock considerations , 2007 .

[8]  Ziping Wang,et al.  A new location-inventory policy with reverse logistics applied to B2C e-markets of China , 2007 .

[9]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[10]  Belarmino Adenso-Díaz,et al.  Environmental and reverse logistics policies in European bottling and packaging firms , 2004 .

[11]  R. W. Grubbström,et al.  Planned lead time determination in a make-to-order remanufacturing system , 2007 .

[12]  Vaidyanathan Jayaraman,et al.  Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach , 2006 .

[13]  Serguei Netessine,et al.  What Can Be Learned from Classical Inventory Models? A Cross-Industry Exploratory Investigation , 2007, Manuf. Serv. Oper. Manag..

[14]  Rommert Dekker,et al.  An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies , 1999, Eur. J. Oper. Res..

[15]  Ludo Gelders,et al.  EOQ type formulations for controlling repairable inventories , 1992 .

[16]  Takeshi Oda,et al.  Recycling of Steel Cans and LCA Study , 2005 .

[17]  Gudrun P. Kiesmüller,et al.  A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes , 2003, Eur. J. Oper. Res..

[18]  Chetan Soman,et al.  Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study , 2007 .

[19]  Otto Rentz,et al.  Modeling reverse logistic tasks within closed-loop supply chains: An example from the automotive industry , 2006, Eur. J. Oper. Res..

[20]  L. N. Van Wassenhove,et al.  Concurrent product and closed-loop supply chain design with an application to refrigerators , 2003 .

[21]  Pär Brander,et al.  Determination of safety stocks for cyclic schedules with stochastic demands , 2006 .

[22]  Low Sui Pheng,et al.  Modeling just-in-time purchasing in the ready mixed concrete industry , 2007 .

[23]  Kenichi Nakajima,et al.  Investigation of Processing Scraps of Steel for the Developing Materials Flow of Recycling System , 2002 .