AN APPLICATION OF VALUE STREAM MAPPING FOR TURNAROUND MAINTENANCE IN OIL AND GAS INDUSTRY: CASE STUDY AND LESSIONS LEARNED

Turnaround maintenance (TAM) in oil and gas industry concerns significant endeavours that deal with inspections, scheduled cleaning, adjustments, repairs and replacements of part of a plant to ensure operational reliability. It involves labour and material-intensive activities, thus is of the essence to minimize the financial impact. However, relevant research revealed that current process improvement strategies for TAM are random, isolated and scattered, improving individual activities in schedules without a systemic consideration of the entire process. Value Stream Mapping (VSM), a process of mapping the material and information flows in a value stream through systematic data capture and analysis, has showed its benefits in identifying and eliminating waste under various circumstances. This paper uses a case-based approach to measure efficiency improvement in TAM activities through VSM. The TAM project for a selected Liquefied Natural Gas (LNG) refinery plant is selected and analysed as a case study. This paper develops a current state map and a future state map to explore the wastes and root causes. The case study reveals that although some challenges and limitations, VSM is feasible in TAM project to improve the efficiency by identifying wastes in process and guiding value improvement.

[1]  Marcello Braglia,et al.  A new value stream mapping approach for complex production systems , 2006 .

[2]  Aditya Parida,et al.  Maintenance Productivity and Performance Measurement , 2009 .

[3]  Marcello Braglia,et al.  Uncertainty in value stream mapping analysis , 2009 .

[4]  Mohamed Ben-Daya,et al.  Handbook of maintenance management and engineering , 2009 .

[5]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[6]  John K. Gershenson,et al.  The Application of Value Stream Mapping to Lean Engineering , 2004 .

[7]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[8]  Christopher C. Obiajunwa A framework for the evaluation of turnaround maintenance projects , 2012 .

[9]  P. Hines,et al.  Learning to evolve: A review of contemporary lean thinking , 2004 .

[10]  Paramdeep Singh,et al.  Application of Lean Tool (Value Stream Mapping) in Minimisation of the Non-Value Added Waste (A Case Study of Tractor Industry) , 2011 .

[11]  John K. Gershenson,et al.  Classification scheme for lean manufacturing tools , 2003 .

[12]  Mohamed Al-Hussein,et al.  Development of Lean Model for House Construction Using Value Stream Mapping , 2009 .

[13]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[14]  Salih O. Duffuaa,et al.  Turnaround maintenance in petrochemical industry: practices and suggested improvements , 2004 .

[15]  John R. Shook,et al.  Learning to See: Value Stream Mapping to Create Value and , 1998 .

[16]  Kyle B. Stone Four decades of lean: a systematic literature review , 2012 .

[17]  Nick Rich,et al.  The seven value stream mapping tools , 1997 .

[18]  C. Pegels The Toyota Production System , 1984 .

[19]  A. F. Rentes,et al.  Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application , 2002 .

[20]  Chris Obiajunwa Risk management - a practical tool for turnaround maintenance , 2012 .

[21]  Ye Li,et al.  From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study , 2010 .

[22]  Matthias Holweg,et al.  The genealogy of lean production , 2007 .

[23]  Christopher C. Obiajunwa Skills for the management of turnaround maintenance projects , 2013 .

[24]  Chandandeep Grewal,et al.  An initiative to implement lean manufacturing using value stream mapping in a small company , 2008, Int. J. Manuf. Technol. Manag..

[25]  Jun Wang,et al.  A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries , 2015 .

[26]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[27]  K. Narasimhan,et al.  Value Stream Management: Eight Steps to Planning, Mapping, and Sustaining Lean Improvements , 2004 .

[28]  Y. Monden Toyota Production System: Practical Approach to Production Management , 1983 .

[29]  Vaibhav Gupta,et al.  Application of value stream mapping for lean operations and cycle time reduction: an Indian case study , 2005 .

[30]  Christine Nadel,et al.  Case Study Research Design And Methods , 2016 .

[31]  Henry H. Bi,et al.  The Impact of Process Mapping on Transparency , 2008 .

[32]  Shaligram Pokharel,et al.  Turn‐around maintenance management in a processing industry , 2008 .