EFFECT OF REDUCED U-235 PRICE ON FUEL CYCLE COSTS
暂无分享,去创建一个
A study was made to determine the effect of changes in natural uranium cost and in separative work charges on fuel cycle costs in nuclear power plants. Reactors considered were a Dresden-type boiling water reactor (BWR) and a Yankee- type pressurized water reactor (PWR), with net power ratings of 100, 300, and 500 Mwe. Fuel cycle costs were calculated for these reactors, using either enriched uranium or U/sup 235/-thorium as the fuel material. The price schedule for uranium was based on a feed material cost of /kg uranium as UF/sub 6/ and separative work costs of /kg uranium (Schedule B) and /kg uranium (Schedule C). The present AEC price schedule for enriched uranium was also used for purposes of a reference case. The results indicate that a reduction in present enriched uranium price to that given by Schedule B would reduce fuel cycle costs for the BWR plants by 0.4 to 0.5 mill/kwh for the enriched-uranium cycle, and 0.4 to 0.7 mill/kwh for the thorium cycle. Reductions in fuel cycle costs for the PWR plants were 0.5 to 0.7 and 0.4 to 0.75 mill/kwh, respectively, for the same situations. (auth)