A Stochastic View on the Effect of Random Rail Irregularities on Railway Bridge Vibrations
暂无分享,去创建一个
[1] Yeong-Bin Yang,et al. Vehicle-bridge interaction dynamics: with applications to high-speed railways , 2004 .
[2] Andreas Andersson,et al. A methodology for the preliminary assessment of existing railway bridges for high-speed traffic , 2014 .
[3] Y. K. Cheung,et al. Impact study of cable-stayed railway bridges with random rail irregularities , 2002 .
[4] Eugene J. O'Brien,et al. Train–track–bridge modelling and review of parameters , 2016 .
[5] Zhiwu Yu,et al. Non-stationary random vibration analysis of a 3D train–bridge system using the probability density evolution method , 2016 .
[6] Lawrence L. Kupper,et al. Probability, statistics, and decision for civil engineers , 1970 .
[7] Nan Zhang,et al. Consideration of nonlinear wheel–rail contact forces for dynamic vehicle–bridge interaction in high-speed railways , 2013 .
[8] Michael Hartnett,et al. Dynamic response of bridges to moving trains: A study on effects of random track irregularities and bridge skewness , 2009 .
[9] Nao-Aki Noda,et al. ANALYSES OF DYNAMIC RESPONSE OF VEHICLE AND TRACK COUPLING SYSTEM WITH RANDOM IRREGULARITY OF TRACK VERTICAL PROFILE , 2002 .
[10] Christoph Adam,et al. Modeling of dynamic train–bridge interaction in high-speed railways , 2015 .
[11] Giuseppe Muscolino,et al. A substructure approach for the dynamic analysis of train-track-bridge system , 2005 .
[12] M. D. Martínez-Rodrigo,et al. Influence of the vehicle model on the prediction of the maximum bending response of simply-supported bridges under high-speed railway traffic , 2014 .
[13] Christoph Adam,et al. Dynamic effect of high-speed trains on simple bridge structures , 2014 .
[14] Nan Zhang,et al. Analysis of resonance mechanism and conditions of train-bridge system , 2006 .
[15] R. B. Tait,et al. Structural performance assessment and fatigue analysis of a railway bridge , 2010 .
[16] Daniel Cantero,et al. Evolution of bridge frequencies and modes of vibration during truck passage , 2017 .
[17] João M. Rocha,et al. Probabilistic assessment of the train running safety on a short-span high-speed railway bridge , 2016 .
[18] Jens C. O. Nielsen,et al. VERTICAL DYNAMIC INTERACTION BETWEEN TRAIN AND TRACK INFLUENCE OF WHEEL AND TRACK IMPERFECTIONS , 1995 .
[19] Werner Schiehlen,et al. MODELING AND SIMULATION OF RAILWAY BOGIE STRUCTURAL VIBRATIONS , 1998 .
[20] João M. Rocha,et al. Probabilistic safety assessment of a short span high-speed railway bridge , 2014 .
[21] Anthony C. Davison,et al. Bootstrap Methods and Their Application , 1998 .
[22] Daniel Cantero,et al. Numerical evaluation of the mid-span assumption in the calculation of total load effects in railway bridges , 2016 .
[23] David Connolly,et al. The influence of train properties on railway ground vibrations , 2016 .
[24] G. De Roeck,et al. A VEHICLE–BRIDGE LINEAR INTERACTION MODEL AND ITS VALIDATION , 2010 .
[25] Rui Calçada,et al. Impact of track irregularities and damping on the fatigue damage of a railway bridge deck slab , 2018 .
[26] Ladislav Frýba,et al. Dynamics of Railway Bridges , 1996 .
[27] B. Efron. Bootstrap Methods: Another Look at the Jackknife , 1979 .
[28] Helmut J. Pradlwarter,et al. Reliability assessment of railway bridges subjected to high-speed trains considering the effects of seasonal temperature changes , 2016 .
[29] T. Arvidsson,et al. Train running safety on non-ballasted bridges , 2018, International Journal of Rail Transportation.