Cabling renovation concept in large‐scale renovation of rural area networks

Purpose – Underground cabling has become a true alternative in construction of electricity distribution networks, even in rural areas. The increasing amount of underground installations requires strategic work that helps to define the most profitable cabling targets. The purpose of this paper is to introduce a methodology to consider the underground cabling process.Design/methodology/approach – The paper proposes a cabling concept that covers the issues on how cabling should be carried out. The analysis is based on techno‐economic and reliability analyses. The methodology consists of several steps that together constitute the concept.Findings – The underground cabling concept comprises several steps that can be simplified into questions: where, what, when and how the network cabling process is carried out. The analysis of these questions and the related features of the network show that different approaches to the renovation can cause significant differences in profitability between the renovation strateg...

[1]  Patrik Hilber,et al.  OPTIMIZING THE REPLACEMENT OF OVERHEAD LINES IN RURAL DISTRIBUTION SYSTEMS WITH RESPECT TO RELIABILITY AND CUSTOMER VALUE , 2005 .

[2]  Jukka Lassila Strategic Development of Electricity Distribution Networks – Concept and Methods , 2009 .

[3]  R. Brown,et al.  Asset management for transmission and distribution , 2005, IEEE Power and Energy Magazine.

[4]  Carl Johan Wallnerström,et al.  A Comparative Study of Regulation Policies for Interruption of Supply of Electrical Distribution Systems in Sweden and UK , 2007 .

[5]  Tooraj Jamasb,et al.  Incentive regulation of electricity distribution networks : Lessons of experience from Britain , 2007 .

[6]  Jukka Lassila,et al.  Concept of strategic planning in electricity distribution business , 2011 .

[7]  Samuli Honkapuro,et al.  Performance benchmarking and incentive regulation – considerations of directing signals for electricity distribution companies , 2008 .

[8]  Jukka Lassila,et al.  Underground cabling strategies in a rural area electricity distribution network , 2009 .

[9]  L. Soder,et al.  Comparison of incentives for distribution system reliability in performance-based regulations , 2004, 2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings.

[10]  O. Samuelsson,et al.  Central or Local Compensation of Earth-Fault Currents in Non-Effectively Earthed Distribution Systems , 2007, 2007 IEEE Lausanne Power Tech.

[11]  Pekka Verho,et al.  Study of alternative strategies for rural area distribution network development , 2009 .

[12]  Kristina Olofsson,et al.  IMPROVEMENT OF THE SUPPLY QUALITY BY INTRODUCTION OF A NEW CONCEPT FOR MODULIZED DISTRIBUTION NETWORKS IN RURAL AREAS OF SWEDEN , 2009 .

[13]  S. Boggs,et al.  Cable life and the cost of risk , 2009, IEEE Electrical Insulation Magazine.

[14]  R. N. Hampton,et al.  Notes from Underground , 2010, IEEE Power and Energy Magazine.

[15]  Per Bengtsson,et al.  Reliability-based planning in rural areas; goals, methods, prioritization, and follow-up at Fortum Distribution , 2009 .

[16]  F. Pilo,et al.  A Multi-Objective Approach to Maximize the Penetration of Distributed Generation in Distribution Networks , 2006, 2006 International Conference on Probabilistic Methods Applied to Power Systems.

[17]  Roy Billinton,et al.  Features that influence composite power system reliability worth assessment , 1997 .

[18]  Kaisa Tahvanainen,et al.  Managing regulatory risks when outsourcing network-related services in the electricity distribution sector , 2010 .

[19]  F. Pilo,et al.  Renewal Planning of Aged Distribution Networks , 2008, Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems.

[20]  Paulien M. Herder,et al.  Long term optimization of asset replacement in energy infrastructures , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.

[21]  Jiachun Guo,et al.  Wisdom about age [aging electricity infrastructure] , 2006, IEEE Power and Energy Magazine.

[22]  G. J. Bertini Prioritizing reliability for underground distribution , 2002 .

[23]  M. Pollitt,et al.  Benchmarking and regulation: international electricity experience , 2000 .

[24]  E. J. Holmes,et al.  Electricity Distribution Network Design , 1989 .