Análisis de Métricas de Similitud en Razonamiento Basado en Casos para Administrar Proyectos
暂无分享,去创建一个
Guillermo Rodríguez | Marcelo Campo | Analía Amandi | Luis Berdún | Alvaro Soria | Álvaro Soria | M. Campo | Guillermo Rodríguez | Luis Berdún | Analía Amandi
[1] Yoanny Torres Rubio,et al. System of Case-Based Reasoning to support software risk identificaction , 2013 .
[2] Sangyong Kim,et al. Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation , 2013 .
[3] ChangTaek Hyun,et al. MRA-based revised CBR model for cost prediction in the early stage of construction projects , 2012, Expert Syst. Appl..
[4] Carl B Traylor. Project Management: A Systems Approach to Planning, Scheduling, and Controlling , 2014 .
[5] Rozhan Othman,et al. Typologizing organizational amnesia , 2004 .
[6] David Leake,et al. Case-Based Reasoning: Experiences, Lessons and Future Directions , 1996 .
[7] Harold Kerzner,et al. Strategic Planning for Project Management Using a Project Management Maturity Model , 2001 .
[8] Padraig Cunningham,et al. A Taxonomy of Similarity Mechanisms for Case-Based Reasoning , 2009, IEEE Transactions on Knowledge and Data Engineering.
[9] JiSae-Hyun,et al. Cost estimation model for building projects using case-based reasoning , 2011 .
[10] Yao Zhang,et al. Generating project risk response strategies based on CBR: A case study , 2015, Expert Syst. Appl..
[11] Anna-Lan Huang,et al. Similarity Measures for Text Document Clustering , 2008 .
[12] Jianping Li,et al. Linear combination of multiple case-based reasoning with optimized weight for software effort estimation , 2010, The Journal of Supercomputing.
[13] Elena Deza,et al. Encyclopedia of Distances , 2014 .
[14] Ioannis Stamelos,et al. Software project management anti-patterns , 2010, J. Syst. Softw..
[15] Chang-Taek Hyun,et al. A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects , 2010 .