Blasting vibration criterion for a rock-anchored beam in an underground powerhouse
暂无分享,去创建一个
Ming Chen | Changping Yi | Wenbo Lu | Wenbo Lu | Ming Chen | Changping Yi
[1] Pc Knodel,et al. Measurements of Strength Parameters of Concrete-Rock Contact at the Dam-Foundation Interface , 1991 .
[2] Z. V. Solymar,et al. Design and underground construction at the Xiaolangdi multipurpose dam site , 1997 .
[3] G. Cowper,et al. STRAIN-HARDENING AND STRAIN-RATE EFFECTS IN THE IMPACT LOADING OF CANTILEVER BEAMS , 1957 .
[4] Xie Yong-bing. Excavation technique of large-span underground powerhouse for Longtan Hydropower Station , 2003 .
[5] R. Gill,et al. Underground works at Kenya's Kiambere project , 1986 .
[6] K. Liao,et al. A study on characteristics of interfacial transition zone in concrete , 2004 .
[7] Zhao Zhen. Researches on load bearing mechanism of rock-bolt crane girder with model tests , 2002 .
[8] P. K. Mehta. Concrete: Structure, Properties, and Materials , 1992 .
[9] Chen Ming. Influence factors of blasting vibration on safety criterion for the freshly placed foundation concrete , 2003 .