A framework for integration model of resource-constrained scheduling using genetic algorithms
暂无分享,去创建一个
[1] J. D. Wiest,et al. A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks , 1977 .
[2] F. F. Boctor,et al. Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .
[3] Weng Tat Chan,et al. CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .
[4] James C. Bean,et al. Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..
[5] E. W. Davis,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[6] Venayagampillai Shanmuganayagam. CURRENT FLOAT TECHNIQUES FOR RESOURCES SCHEDULING , 1989 .
[7] Said M. Easa,et al. Resource Leveling in Construction by Optimization , 1989 .
[8] Sönke Hartmann,et al. A competitive genetic algorithm for resource-constrained project scheduling , 1998 .
[9] Sou-Sen Leu,et al. GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .
[10] Masatoshi Sakawa,et al. Genetic Algorithms and Fuzzy Multiobjective Optimization , 2001 .
[11] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[12] Tarek Hegazy,et al. Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .
[13] Osama Moselhi,et al. Least impact algorithm for resource allocation , 1993 .
[14] Calin Popescu,et al. Project Planning, Scheduling, and Control in Construction: An Encyclopedia of Terms and Applications , 1995 .