Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations
暂无分享,去创建一个
[1] Herbert Jodlbauer,et al. Material and capacity requirements planning with dynamic lead times , 2012 .
[2] Xiao Xu,et al. An asynchronous genetic local search algorithm for the permutation flowshop scheduling problem with total flowtime minimization , 2011, Expert Syst. Appl..
[3] J. Grabowski,et al. The permutation flow shop problem with blocking. A tabu search approach , 2007 .
[4] Mitsuo Gen,et al. Hybrid sampling strategy-based multiobjective evolutionary algorithm for process planning and scheduling problem , 2014, J. Intell. Manuf..
[5] Mohamed Haouari,et al. Improved bounds for hybrid flow shop scheduling with multiprocessor tasks , 2013, Comput. Ind. Eng..
[6] Lars Mönch,et al. Scheduling jobs with ready times and precedence constraints on parallel batch machines using metaheuristics , 2014, Comput. Ind. Eng..
[7] Silvana Trimi,et al. A comparative study of proprietary ERP and open source ERP modules on the value chain , 2011, Int. J. Inf. Decis. Sci..
[8] Massimo Paolucci,et al. Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach , 2013 .
[9] Ming Liu,et al. A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem , 2013, Comput. Oper. Res..
[10] Antonio Costa,et al. A dual encoding-based meta-heuristic algorithm for solving a constrained hybrid flow shop scheduling problem , 2013, Comput. Ind. Eng..
[11] Cengiz Kahraman,et al. An Application Of Effective Genetic Algorithms For Solving Hybrid Flow Shop Scheduling Problems , 2008, Int. J. Comput. Intell. Syst..
[12] S. H. Choi,et al. A hybrid estimation of distribution algorithm for simulation-based scheduling in a stochastic permutation flowshop , 2015, Comput. Ind. Eng..
[13] Rym M'Hallah,et al. Minimizing total earliness and tardiness on a permutation flow shop using VNS and MIP , 2014, Comput. Ind. Eng..
[14] N. Jawahar,et al. A heuristic algorithm for joint optimisation of MRP and scheduling in a mixed model assembly line , 2009, Int. J. Adv. Oper. Manag..
[15] Ching-Jong Liao,et al. An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan , 2015, Comput. Ind. Eng..
[16] A. Costa,et al. Hybrid genetic optimization for solving the batch-scheduling problem in a pharmaceutical industry , 2015, Comput. Ind. Eng..
[17] Katsuhiko Takahashi,et al. A New Heuristic Method for Capacitated Lot-sizing in Multi-stage, Multi-machine Production Systems , 2005 .
[18] Jinwoo Park,et al. Integrated model for production planning and scheduling in a supply chain using benchmarked genetic algorithm , 2008 .
[19] Dipak Laha,et al. An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop , 2014, Comput. Ind. Eng..
[20] Pisal Yenradee,et al. Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory , 2007 .
[21] R. Sridharan,et al. Development and analysis of hybrid genetic algorithms for flow shop scheduling with sequence dependent setup time , 2014 .
[22] Tommaso Rossi,et al. A simulation-based finite capacity MRP procedure not depending on lead time estimation , 2011 .
[23] Mitsuo Gen,et al. Adaptive genetic algorithm for advanced planning in manufacturing supply chain , 2006, J. Intell. Manuf..
[24] Mitsuo Gen,et al. A Multiobjective Hybrid Genetic Algorithm for TFT-LCD Module Assembly Scheduling , 2014, IEEE Transactions on Automation Science and Engineering.
[25] Yueh-Min Huang,et al. Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm , 2008, Expert Syst. Appl..
[26] Marcelo Seido Nagano,et al. A Constructive Genetic Algorithm for Permutation Flowshop Scheduling Version 2 , 2007 .
[27] Mitsuo Gen,et al. Effective genetic approach for optimizing advanced planning and scheduling in flexible manufacturing system , 2006, GECCO.
[28] Mitsuo Gen,et al. A new model for single machine scheduling with uncertain processing time , 2017, J. Intell. Manuf..
[29] Frank Werner,et al. A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria , 2009, Comput. Oper. Res..
[30] Weiming Shen,et al. An overview of distributed process planning and its integration with scheduling , 2006, Int. J. Comput. Appl. Technol..
[31] Cemalettin Öztürk,et al. Capacitated lot sizing with linked lots for general product structures in job shops , 2010, Computers & industrial engineering.
[32] Wen-Hsien Tsai,et al. Successful global ERP rollout: a case study , 2011 .
[33] S. H. Choi,et al. Flexible flow shop scheduling with stochastic processing times: A decomposition-based approach , 2012, Comput. Ind. Eng..
[34] Arslan M. Ornek,et al. Capacitated lot sizing with alternative routings and overtime decisions , 2006 .
[35] Ping Chen,et al. Self-adaptive perturbation and multi-neighborhood search for iterated local search on the permutation flow shop problem , 2015, Comput. Ind. Eng..
[36] Pisal Yenradee,et al. Finite capacity material requirement planning system for assembly flow shop with alternative work centres , 2014 .
[37] Cemalettin Öztürk,et al. A MIP based heuristic for capacitated MRP systems , 2012, Computers & industrial engineering.
[38] Muh-Cherng Wu,et al. Effect of solution representations on Tabu search in scheduling applications , 2013, Comput. Oper. Res..
[39] John J. Kanet,et al. Integrating production planning and control: towards a simple model for Capacitated ERP , 2010 .
[40] Bernardo Almada-Lobo,et al. Lot sizing and scheduling: industrial extensions and research opportunities , 2011 .
[41] Katsuhiko Takahashi,et al. MRP rescheduling heuristics with capacity extension under deterministic demand , 2006, Comput. Ind. Eng..
[42] Ruhul A. Sarker,et al. A genetic algorithm for permutation flow shop scheduling under make to stock production system , 2015, Comput. Ind. Eng..