Evaluation the effects of the synchronous generator circuit breaker on the reliability of busbar layout in power plant substation in deregulated electricity market
暂无分享,去创建一个
[1] Roy Billinton,et al. Generalized n+2 state system Markov model for station-oriented reliability evaluation , 1997 .
[2] B. Culver,et al. Prevention of tank rupture of faulted power transformers by generator circuit breakers , 2007 .
[3] S. Premrudeepreechacharn,et al. Reliability evaluation of substation delivery point with time varying load , 2004, 2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings.
[4] D. Karlsson,et al. Reliability and life cycle cost estimates of 400 kV substation layouts , 1997 .
[5] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[6] H.G. Sarmiento,et al. Algorithm to evaluate substations reliability with cut and path sets , 2004, Conference Record of the 2004 IEEE Industry Applications Conference, 2004. 39th IAS Annual Meeting..
[7] Dieter Braun,et al. Reliability and economic analysis of different power station layouts , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.