Resource Scheduling Using Neural Dynamics Model of Adeli and Park

This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally focused on project duration minimization. The proposed model considers the total project cost minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The proposed model is solved using the patented neural dynamics model of Adeli and Park. A case study is presented to demonstrate the performance of the method under various resource availability profiles.

[1]  Weng Tat Chan,et al.  CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .

[2]  J. M. Tamarit,et al.  Project scheduling with resource constraints: A branch and bound approach , 1987 .

[3]  Sabah U. Randhawa,et al.  Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs , 1997 .

[4]  Erik Demeulemeester,et al.  New Benchmark Results for the Resource-Constrained Project Scheduling Problem , 1997 .

[5]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[6]  Hyo Seon Park,et al.  Neurocomputing for Design Automation , 2018 .

[7]  Paul Fazio,et al.  Construction resource leveling using neural networks , 1996 .

[8]  Hojjat Adeli,et al.  Machine Learning: Neural Networks, Genetic Algorithms, and Fuzzy Systems , 1994 .

[9]  E. W. Davis,et al.  Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .

[10]  P. Fazio,et al.  Calculating Weight Matrix of Neural Network for Resource Leveling , 1998 .

[11]  Fadi A. Karaa,et al.  Resource Management in Construction , 1986 .

[12]  F. F. Boctor,et al.  Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .

[13]  Gündüz Ulusoy,et al.  Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling , 1989 .

[14]  Hojjat Adeli,et al.  Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .

[15]  F. Brian Talbot,et al.  Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .

[16]  Said M. Easa,et al.  Resource Leveling in Construction by Optimization , 1989 .

[17]  James H. Patterson,et al.  Scheduling a Project Under Multiple Resource Constraints: A Zero-One Programming Approach , 1976 .

[18]  Robert I. Carr,et al.  Resource Strategies for Dynamic Project Management , 1991 .

[19]  Edward W. Davis,et al.  Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .

[20]  Robert B. Harris Packing Method for Resource Leveling (PACK) , 1990 .

[21]  Gerald W. Evans,et al.  Time-Constrained Resource Leveling , 1991 .

[22]  Arne Thesen,et al.  Heuristic Scheduling of Activities under Resource and Precedence Restrictions , 1976 .

[23]  J. D. Wiest,et al.  A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks , 1977 .

[24]  Ian C. Goulter,et al.  MIXED INTEGER MODEL FOR RESOURCE ALLOCATION IN PROJECT MANAGEMENT , 1989 .

[25]  Hojjat Adeli,et al.  Optimization of space structures by neural dynamics , 1995, Neural Networks.

[26]  James M. Antill,et al.  Critical path methods in construction practice , 1970 .

[27]  James H. Patterson,et al.  An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems , 1978 .