A green supply chain model of vendor and buyer for remanufacturing
暂无分享,去创建一个
[1] K. S. Chaudhuri,et al. Two-echelon competitive integrated supply chain model with price and credit period dependent demand , 2016, Int. J. Syst. Sci..
[2] Shibaji Panda. Coordination of a socially responsible supply chain using revenue sharing contract , 2014 .
[3] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[4] Biswajit Sarkar,et al. An EOQ model with delay in payments and time varying deterioration rate , 2012, Math. Comput. Model..
[5] Shibaji Panda. Optimal pricing and replenishment policy in a declining price sensitive environment under continuous unit cost decrease , 2011, Int. J. Math. Oper. Res..
[6] K. Richter,et al. Analysis of the EOQ repair and waste disposal problem with integer setup numbers , 1999 .
[7] Steven Nahmiasj,et al. A deterministic model for a repairable item inventory system with a finite repair rate , 1979 .
[8] Chao-Kuei Huang,et al. An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments , 2010 .
[9] S. Goyal. Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .
[10] Leopoldo Eduardo Cárdenas-Barrón,et al. An inventory model with trade-credit policy and variable deterioration for fixed lifetime products , 2015, Ann. Oper. Res..
[11] D. Schrady. A deterministic inventory model for reparable items , 1967 .
[12] Kun-Jen Chung,et al. The simplified solution procedure for deteriorating items under stock-dependent demand and two-level trade credit in the supply chain management , 2013 .
[13] S. R. Singh,et al. A Closed Loop Supply Chain System with Flexible Manufacturing and Reverse Logistics Operation under Shortages for Deteriorating Items , 2013 .
[14] B. Sarkar. Supply Chain Coordination with Variable Backorder, Inspections, and Discount Policy for Fixed Lifetime Products , 2016 .
[15] Neha Saxena,et al. An Integrated Inventory Model with Remanufacturing of Secondary Material under Shortages , 2014 .
[16] Samir K. Srivastava,et al. Green Supply-Chain Management: A State-of-the-Art Literature Review , 2007 .
[17] C. Y. Peng,et al. Collaboration for a closed-loop deteriorating inventory supply chain with multi-retailer and price-sensitive demand , 2013 .
[18] Kuo-Ren Lou,et al. A comprehensive extension of an integrated inventory model with ordering cost reduction and permissible delay in payments , 2013 .
[19] A. Taleizadeh,et al. An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity , 2015 .
[20] Biswajit Sarkar,et al. A production-inventory model with probabilistic deterioration in two-echelon supply chain management , 2013 .
[21] Hui-Ming Wee,et al. Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system , 2011 .
[22] Chang-Hyun Kim,et al. Lot-streaming policy for forward–reverse logistics with recovery capacity investment , 2013 .
[23] Neha Saxena,et al. A centralized reverse channel structure with flexible manufacturing under the stock out situation , 2013 .
[24] Neha Saxena,et al. An Optimal Returned Policy for a Reverse Logistics Inventory Model with Backorders , 2012, Adv. Decis. Sci..
[25] Biswajit Sarkar,et al. An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production , 2012, Appl. Math. Comput..
[26] Biswajit Sarkar,et al. An integrated inventory model with variable lead time, defective units and delay in payments , 2014, Appl. Math. Comput..
[27] R. Dekker,et al. Reverse logistics : quantitative models for closed-loop supply chains , 2004 .
[28] L. Cárdenas-Barrón,et al. Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity , 2014 .
[29] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[30] K. Richter. Pure and mixed strategies for the EOQ repair and waste disposal problem , 1997 .
[31] B. Sarkar,et al. An inventory model with time dependent demand and shortages under trade credit policy , 2013 .
[32] L. Ouyang,et al. Optimal strategy for an integrated system with variable production rate when the freight rate and trade credit are both linked to the order quantity , 2008 .
[33] K. S. Chaudhuri,et al. A deterministic EOQ model with delays in payments and price-discount offers , 2008, Eur. J. Oper. Res..