Benefits from a SMED Application in a Punching Machine
暂无分享,去创建一个
[1] Geraint W Owen,et al. Changeover improvement: A maintenance perspective , 2001 .
[2] B. G. Dale,et al. Set-up time reduction and mistake proofing methods - A study of application in a small company , 2001, Bus. Process. Manag. J..
[3] Dinesh Khanduja,et al. SMED: for quick changeovers in foundry SMEs , 2009 .
[4] 新郷 重夫,et al. A study of the Toyota production system from an industrial engineering viewpoint , 1989 .
[5] R. M. Sousa,et al. An industrial application of resource constrained scheduling for quick changeover , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.
[6] Edward J. Hay. Any machine set-up time can be reduced by 75% , 1987 .
[7] Geraint W Owen,et al. A critical evaluation of Shingo's 'SMED' (Single Minute Exchange of Die) methodology , 2000 .
[8] Berna Ulutas,et al. An Application of SMED Methodology , 2011 .
[9] Bengt Klefsjö,et al. The machine that changed the world , 2008 .
[10] R. Bohn,et al. Setup Time Reduction for Electronics Assembly: Combining Simple (SMED) and IT‐Based Methods , 2005 .
[11] Ronny Fritsche,et al. Reducing set-up times for improved flexibility in high-mix low-volume electric drives production , 2011, 2011 1st International Electric Drives Production Conference.
[12] Sven Maričić,et al. Die casting process assessment using single minute exchange of dies (SMED) method , 2009 .
[13] 新郷 重夫,et al. A revolution in manufacturing : the SMED system , 1985 .
[14] Supramaniam Tharisheneprem. Achieving full fungibility and Quick Changeover by turning knobs in tape and Reel machine by applying SMED theory , 2008, 2008 33rd IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT).
[15] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[16] Richard Greatbanks,et al. Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment , 2001 .
[17] Dirk Van Goubergen,et al. Reducing Set-up Times of Manufacturing Lines , 2002 .
[18] M. Gilmore,et al. Set‐up reduction in pharmaceutical manufacturing: an action research study , 1996 .