A numerical study into the evolution of loads on shores and slabs during construction of multistorey buildings. Comparison of partial striking with other techniques

This paper contains a summary and evaluation of an experimental research project carried out at the ICITECH laboratories, Valencia, Spain. The project consisted of the construction of a full-scale building that included a process of shoring, clearing and striking (SCS). The experimental model was used as the basis for the development of a FE model, including an evolving calculation, with the objective of simulating the construction process used, as well as studying the evolution of concrete properties during the test. The FE model was verified with the results obtained from the experimental model. Two further FE models were then developed from the original model and used to simulate the construction of the same building using two different construction processes: one involving shoring and striking (SS) and the other shoring, re-shoring and striking (SRS). Finally, the SCS was compared to the SS and SRS processes, respectively, and an analysis was made of the advantages and disadvantages of each one. The paper breaks new ground in that for the first time ever a comparative study is made of the three most frequently used shoring techniques.

[1]  Alvarado Vargas,et al.  Estudio experimental y numérico de la construcción de forjados hormigonados in situ mediante un proceso de cimbrado, clareado y descimbrado de plantas consecutivas. , 2011 .

[2]  Jose M. Adam,et al.  An experimental study into the evolution of loads on shores and slabs during construction of multistory buildings using partial striking , 2009 .

[3]  Justo Díaz Lozano Criterios técnicos para el descimbrado de estructuras de hormigón , 2011 .

[4]  P C Stivaros,et al.  Shoring/Reshoring Operations for Multistory Buildings , 1990 .

[5]  Paul Grundy,et al.  Construction Loads on Slabs with Shored Formwork in Multistory Buildings , 1963 .

[6]  Eugenio Pellicer,et al.  An Analysis Of concrete Framed Structures During The Construction Process , 1996 .

[7]  D Kaminetzky,et al.  Early-Age Concrete: Construction Loads, Behavior, and Failures , 1994 .

[8]  Dong-Ping Fang,et al.  On-Site Measurement of Load Distribution in Reinforced Concrete Buildings During Construction , 2001 .

[9]  Mark D. Bowman,et al.  Construction Load Analysis for Concrete Structures , 1985 .

[10]  Dov Kaminetzky [沅뚰븯?붿콉] Design and Construction Failures , 1997 .

[11]  F. Cussigh,et al.  Using the maturity method in concrete cracking control at early ages , 2004 .

[12]  Jose M. Adam,et al.  A study of the conditions of use of a new safety system for the building industry , 2007 .

[13]  A. W. Beeby The forces in backprops during construction of flat slab structures , 2001 .

[14]  Wai-Fah Chen,et al.  DETERMINING SHORING LOADS FOR REINFORCED CONCRETE CONSTRUCTION , 1991 .

[15]  Arthur H. Nilson,et al.  Design of concrete structures , 1972 .

[16]  A W Beeby,et al.  CONCISE EUROCODE FOR THE DESIGN OF CONCRETE BUILDINGS. BASED ON BSI PUBLICATION DD ENV 1992-1-1: 1992. EUROCODE 2: DESIGN OF CONCRETE STRUCTURES. PART 1: GENERAL RULES AND RULES FOR BUILDINGS , 1993 .

[17]  Mark G. Stewart,et al.  Structural Reliability of Multistory Buildings during Construction , 2002 .