A simulation tool for complex assembly lines with multi-skilled resources
暂无分享,去创建一个
[1] Oliver Rose,et al. A prototype simulation tool for a framework for simulation-based optimization of assembly lines , 2011, Proceedings of the 2011 Winter Simulation Conference (WSC).
[2] Jirachai Buddhakulsomsiri,et al. Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting , 2006, Eur. J. Oper. Res..
[3] Subbarao Kambhampati,et al. Planning and Scheduling , 1997, The Computer Science and Engineering Handbook.
[4] Averill M. Law,et al. Simulation optimization: simulation-based optimization , 2002, WSC '02.
[5] Fred Glover,et al. Practical introduction to simulation optimization , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..
[6] Michael Pinedo,et al. Planning and Scheduling in Manufacturing and Services , 2008 .
[7] F. Al-Shamali,et al. Author Biographies. , 2015, Journal of social work in disability & rehabilitation.
[8] R. Haupt,et al. A survey of priority rule-based scheduling , 1989 .
[9] Fred W. Glover,et al. Simulation-based optimization: practical introduction to simulation optimization , 2003, WSC '03.
[10] Oliver Rose,et al. Framework for simulation based scheduling of assembly lines , 2010, Proceedings of the 2010 Winter Simulation Conference.
[11] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[12] Alexander Shapiro. Simulation based optimization , 1996, Winter Simulation Conference.
[13] Oliver Rose,et al. A Simulation-Based Optimization heuristic using self-organization for complex assembly lines , 2012, Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC).