Discrete event simulation for shop floor control
暂无分享,去创建一个
Jeffrey S. Smith | Richard A. Wysk | Sanjay B. Joshi | David T. Sturrock | Glen D. Smith | Sanjay E. Ramaswamy | Jeffrey S. Smith | S. Joshi | R. Wysk | D. Sturrock | S. Ramaswamy | Glen D. Smith
[1] Hyunbo Cho,et al. Intelligent workstation controller for computer-integrated manufacturing: Problems and models , 1995 .
[2] Richard A. Wysk,et al. Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells , 1988 .
[3] Michael J. Drevna,et al. Introduction to Arena , 1994, Proceedings of Winter Simulation Conference.
[4] C. M. Harmonosky,et al. Real-time scheduling in computer integrated manufacturing: a review of recent research , 1991 .