Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming
暂无分享,去创建一个
[1] U. Klanšek. Mixed-Integer Nonlinear Programming Model for Nonlinear Discrete Optimization of Project Schedules under Restricted Costs , 2016 .
[2] Sameh M. El-Sayegh,et al. Time–Cost Optimization Model Considering Float-Consumption Impact , 2015 .
[3] Premysl Sucha,et al. Production scheduling with alternative process plans , 2011, Eur. J. Oper. Res..
[4] Uroš Klanšek,et al. Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs , 2016 .
[5] Amin Mahmoudi,et al. A grey mathematical model for crashing of projects by considering time, cost, quality, risk and law of diminishing returns , 2018, Grey Syst. Theory Appl..
[6] Morteza Bagherpour,et al. Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study , 2018, J. Intell. Fuzzy Syst..
[7] Sameh M. El-Sayegh. Resource levelling optimization model considering float loss impact , 2018 .
[8] N. P. Suh,et al. An Integrated Approach to Process Planning and Scheduling , 1985 .
[9] Mirko Psunder,et al. MINLP optimization model for the nonlinear discrete time-cost trade-off problem , 2012, Adv. Eng. Softw..
[10] Saeed Mansour,et al. Dynamic flexible job shop scheduling with alternative process plans: an agent-based approach , 2011 .
[11] Mario Vanhoucke,et al. Maximising the weighted number of activity execution modes in project planning , 2018, Eur. J. Oper. Res..
[12] Stefan Helber,et al. Scheduling resource-constrained projects with a flexible project structure , 2013, Eur. J. Oper. Res..
[13] Mª Carmen González-Cruz,et al. Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking , 2019, Automation in Construction.
[14] Sha Tao,et al. Scheduling resource-constrained project problem with alternative activity chains , 2017, Comput. Ind. Eng..
[15] M. Bashiri,et al. Modeling of the time-dependent multi-skilled RCPSP considering learning effect , 2019, Journal of Modelling in Management.
[16] Valenko Tadej,et al. An integration of spreadsheet and project management software for cost optimal time scheduling in construction , 2017 .
[17] Behrokh Khoshnevis,et al. Generation of alternative process plans in integrated manufacturing systems , 2003, J. Intell. Manuf..
[18] M. Feylizadeh,et al. A novel algorithm for solving resource-constrained project scheduling problems: a case study , 2019, Journal of Advances in Management Research.
[19] Luong Duc Long,et al. Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution , 2018, Engineering, Construction and Architectural Management.
[20] Nikolaos V. Sahinidis,et al. A branch-and-reduce approach to global optimization , 1996, J. Glob. Optim..
[21] Awad S. Hanna,et al. Impact of Shift Work on Labor Productivity for Labor Intensive Contractor , 2008 .
[22] Chih-Han Yu,et al. Short-Interval Dynamic Forecasting for Actual S -Curve in the Construction Phase , 2011 .
[23] J. Christopher Beck,et al. Constraint-directed techniques for scheduling alternative activities , 2000, Artif. Intell..
[24] Mario Vanhoucke,et al. A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs , 2019, Eur. J. Oper. Res..
[25] Sönke Hartmann,et al. A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[26] Ernst Rank,et al. Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation , 2010, Adv. Eng. Informatics.