Minimization of Resource Requirement and Inter-plant Cross Flow Across Resource Allocation Networks
暂无分享,去创建一个
[1] R. Tan. Fuzzy Optimization Model for Source-Sink Water Network Synthesis with Parametric Uncertainties , 2011 .
[2] Dominic Chwan Yee Foo,et al. Flowrate targeting for threshold problems and plant-wide integration for water network synthesis. , 2008, Journal of environmental management.
[3] H. Pillai,et al. Process water management , 2006 .
[4] Sara E. Keckler,et al. Material Reuse Modeling , 1998 .
[5] Cheng-Liang Chen,et al. Design of inter-plant water network with central and decentralized water mains , 2010, Comput. Chem. Eng..
[6] Jose B. Cruz,et al. Bi-level fuzzy optimization approach for water exchange in eco-industrial parks , 2010 .
[7] Raymond R. Tan,et al. Designing eco-industrial water exchange networks using fuzzy mathematical programming , 2010 .
[8] Denny K. S. Ng,et al. Synthesis of Direct and Indirect Interplant Water Network , 2008 .
[9] Denny K. S. Ng,et al. Flowrate Targeting Algorithm for Interplant Resource Conservation Network. Part 1: Unassisted Integration Scheme , 2010 .
[10] Denny K. S. Ng,et al. Flowrate Targeting Algorithm for Interplant Resource Conservation Network . Part 2 : Assisted Integration Scheme , 2010 .