Discussion on the blasting scheme design of high-speed railway tunnel construction control

Taking the comprehensive construction technology of underneath pass existing highway of Beijing-Shanghai high-speed rail Jinniu Mountain as the research content,combining with the characteristics of Jinniu Mountain tunnel,using empirical formula designed the blasting scheme,in order to determine the single maximum charge,so as to provide reference for engineering practice.