The optimal production cycle time in an integrated production-inventory model for decaying raw materials

Abstract In 1983, Park presented an integrated production-inventory model for decaying raw materials. This paper discusses the same model as that of Park. The main purpose is threefold: (1) This paper shows that the total cost function per unit time is convex by a rigorous proof. (2) This paper derives the closed forms for the upper and lower bounds on the optimal cycle time of the total cost function per unit time, thereby enabling straightforward application of the standard bisection algorithm to numerically compute the optimal cycle time. (3) This paper compares optimal solutions obtained by using our approach (the bisection algorithm) and Park’s approach. Numerical examples show that our approach is better.

[1]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[2]  S. Aggarwal,et al.  Ordering Policies of Deteriorating Items under Permissible Delay in Payments , 1995 .

[3]  S. Goyal Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .

[4]  Peter Chu,et al.  Economic order quantity of deteriorating items under permissible delay in payments , 1998, Comput. Oper. Res..

[5]  Kun-Jen Chung,et al.  The convexities of the present value functions of all future cash outflows in inventory and credit , 2000 .

[6]  Hark Hwang,et al.  Retailer's pricing and lot sizing policy for exponentially deteriorating products under the condition of permissible delay in payments , 1997, Comput. Oper. Res..

[7]  Kun-Jen Chung,et al.  THE OPTIMAL ORDERING POLICY IN A DCF ANALYSIS FOR DETERIORATING ITEMS WHEN TRADE CREDIT DEPENDS ON THE ORDER QUANTITY , 2006 .

[8]  Kun-Jen Chung,et al.  An exact solution of cash flow for an integrated evaluation of investment in inventory and credit , 1998 .

[9]  Kun-Jen Chung A theorem on the determination of economic order quantity under conditions of permissible delay in payments , 1998, Comput. Oper. Res..

[10]  Kyung S. Park An integrated production-inventory model for decaying raw materials , 1983 .

[11]  Kun-Jen Chung,et al.  The optimal cycle time for EPQ inventory model under permissible delay in payments , 2003 .

[12]  Ram Rachamadugu Error bounds for EOQ , 1988 .

[13]  Kee H. Chung,et al.  AN INTEGRATED EVALUATION OF INVESTMENT IN INVENTORY AND CREDIT: A CASH FLOW APPROACH , 2008 .