Evaluation of postponement in manufacturing systems with non-negligible changeover times

This article aims to examine the cost or benefit implications of employing postponement in the manufacturing environments characterised by non-negligible changeover times incurred when switching production from one product to another. Four manufacturing configurations are distinguished based on the choice of manufacturing technology and on whether or not postponement is employed. Analytical evaluation methods based on queuing models are used to assess operational measures for each configuration and solution algorithms are developed to determine the optimal decisions that may include stocking level, batch size and differentiation point. A numerical experiment is carried out to identify how the system performance is affected by different parameters.

[1]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[2]  Lihui Wang,et al.  Reconfigurable manufacturing systems: the state of the art , 2008 .

[3]  Jayashankar M. Swaminathan,et al.  Managing broader product lines through delayed differentiation using vanilla boxes , 1998 .

[4]  F. Musharavati RECONFIGURABLE MANUFACTURING SYSTEMS , 2010 .

[5]  Diwakar Gupta,et al.  Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis , 2004 .

[6]  Hoda A. ElMaraghy,et al.  Modelling and optimization of multiple-aspect RMS configurations , 2006 .

[7]  Feng Cheng,et al.  A Practical Scheduling Method for Multiclass Production Systems with Setups , 1999 .

[8]  Uday S. Karmarkar,et al.  Multi-item batching heuristics for minimization of queueing delays , 1992 .

[9]  Ulrich Wilhelm Thonemann,et al.  Production , Manufacturing and Logistics The effect of product variety on supply-chain performance , 2002 .

[10]  Zhao Xiaobo,et al.  A stochastic model of a reconfigurable manufacturing system Part 3: Optimal selection policy , 2001 .

[11]  Paul H. Zipkin,et al.  Tandem Queues with Planned Inventories , 1992, Oper. Res..

[12]  R. V. Hoek,et al.  The rediscovery of postponement a literature review and directions for research , 2001 .

[13]  Xiande Zhao,et al.  Improving the supply chain performance: Use of forecasting models versus early order commitments , 2001 .

[14]  W. Zinn,et al.  PLANNING PHYSICAL DISTRIBUTION WITH THE PRINCIPLE OF POSTPONEMENT , 1988 .

[15]  Hau L. Lee,et al.  Design for Postponement , 2003, Supply Chain Management.

[16]  G. Dobson,et al.  PRODUCT OFFERING, PRICING, AND MAKE‐TO‐STOCK/MAKE‐TO‐ORDER DECISIONS WITH SHARED CAPACITY , 2002 .

[17]  Peter Dapiran Benetton – Global Logistics in Action , 1992 .

[18]  Juliana Hsuan Mikkola,et al.  Supply-chain integration: implications for mass customization, modularization and postponement strategies , 2004 .

[19]  T. V. Kumaresh,et al.  The false promise of mass customization , 2001 .

[20]  Saif Benjaafar,et al.  On the Effect of Product Variety in Production–Inventory Systems , 2004, Ann. Oper. Res..

[21]  B. Tabrizi,et al.  Defining next-generation products: an inside look. , 1997, Harvard business review.

[22]  Hau L. Lee,et al.  Hewlett-Packard Gains Control of Inventory and Service through Design for Localization , 1993 .

[23]  M. Reza Abdi,et al.  Grouping and selecting products: the design key of Reconfigurable Manufacturing Systems (RMSs) , 2004 .

[24]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[25]  N. D. Burns,et al.  Postponement: a review and an integrated framework , 2004 .

[26]  M. Cooper,et al.  Supply Chain Postponement and Speculation Strategies: How to choose the right strategy , 1998 .

[27]  M. Naim,et al.  Analysis of form postponement based on optimal positioning of the differentiation point and stocking decisions , 2009 .

[28]  Mark Ferguson,et al.  Evaluation of postponement structures to accommodate mass customization , 2005 .

[29]  Steve J. Culley,et al.  Changeover Improvement: Reinterpreting Shingo's “SMED” Methodology , 2007, IEEE Transactions on Engineering Management.

[30]  Hau L. Lee,et al.  Mass Customization at Hewlett-Packard : The Power of Postponement , 1999 .

[31]  Zhao Xiaobo,et al.  A stochastic model of a reconfigurable manufacturing system Part 1: A framework , 2000 .

[32]  Christopher S. Tang,et al.  On postponement strategies for product families with multiple points of differentiation , 1997 .

[33]  S. Graves,et al.  Supply chain management : design, coordination and operation , 2003 .

[34]  Donald J. Bowersox,et al.  Logistical Management: The Integrated Supply Chain Process , 1974 .

[35]  Stephen C. Graves,et al.  A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment , 1985 .

[36]  Wroe Alderson,et al.  Marketing efficiency and the principle of Postponement , 2006 .

[37]  Awi Federgruen,et al.  Design for Postponement: A Comprehensive Characterization of Its Benefits Under Unknown Demand Distributions , 2001, Oper. Res..

[38]  Christopher S. Tang,et al.  Modelling the Costs and Benefits of Delayed Product Differentiation , 1997 .

[39]  Awi Federgruen,et al.  Capacitated Multi-Item Inventory Systems with Random and Seasonally Fluctuating Demands: Implications for Postponement Strategies , 2001, Manag. Sci..

[40]  Frank T. Piller,et al.  Does mass customization pay? An economic approach to evaluate customer integration , 2004 .