Modeling uncertainties in mining pillar stability analysis.
暂无分享,去创建一个
[1] Roland F. Bekendam,et al. Stability and Subsidence Assessment over Shallow Abandoned Room and Pillar Limestone Mines , 2004 .
[2] Bernard Roy,et al. Use of multi-criteria decision-aids for risk zoning and management of large area subjected to mining-induced hazards , 2004 .
[3] Gm Swift,et al. Stability problems associated with an abandoned ironstone mine , 2002 .
[4] Herbert H. Einstein. Risk and risk analysis in rock engineering , 1996 .
[5] A. Karakas. Practical Rock Engineering , 2008 .
[6] Yacov Y. Haimes,et al. Risk modeling, assessment, and management , 1998 .
[7] A. H. Salamon,et al. A study of the strength of coal pillars , 1967 .
[8] G. Baecher. Reliability and Statistics in Geotechnical Engineering , 2003 .
[9] D F Coates. Principes de la mécanique des roches , 1972 .
[10] Maxime Cauvin,et al. Dealing with uncertainties in the context of post mining hazard evaluation , 2008 .
[11] J. N. Van Der Merwe,et al. New pillar strength formula for South African coal , 2003 .
[12] Abdallah I. Husein Malkawi,et al. Uncertainty and reliability analysis applied to slope stability , 2000 .
[13] Norbert R. Morgenstern,et al. Probabilistic stability analysis of a tailings dyke on presheared clay-shale , 2003 .
[14] F. Knight. The economic nature of the firm: From Risk, Uncertainty, and Profit , 2009 .
[15] Y. Haimes. Risk Modeling, Assessment, and Management: Haimes/Risk Modeling, Assessment 2e , 2005 .
[16] H. Gao,et al. Probabilistic approaches to estimating variation in the mechanical properties of rock masses , 1995 .