Winners and losers of market coupling

The integration of electricity markets creates new challenges to the regulators in their commitment to guarantee security of supply at affordable prices. Even at a national level, designing policies for electricity markets is an extremely complex task; but this is exacerbated in the case of market coupling, since different policies may be applied at the two ends of an interconnector. Furthermore, investors will make decisions based on their profitability, which depends among other things on the possibility of importing (exporting) from (to) neighboring countries, and will not necessarily coincide with the aims of the regulators or the consumers. We use simulation to analyze different scenarios of interconnection and capacity payments in two case studies: Colombia – Ecuador and Great Britain – France. These two cases exhibit important differences in terms of resources and complementarity between the countries, which lead to quite different outcomes for the same policies. The simulation results show that the potential benefits of market coupling are strongly related to complementarity. However, identifying the policies that should be implemented in order to achieve those benefits is far from obvious. In particular, large generation investment requirements and significant storage capacity in the region may lead to counterintuitive outcomes for certain policies.

[1]  Karsten Neuhoff,et al.  Working Papers in Economics CWPE 0463 Electricity Transmission : An Overview of the Current Debate , 2004 .

[2]  J. Rosellón,et al.  Merchant Electricity Transmission Expansion: A European Case Study , 2010 .

[3]  Gert Brunekreeft,et al.  Regulatory issues in merchant transmission investment , 2005 .

[4]  P. Cramton,et al.  A capacity market that makes sense , 2005, IEEE Power Engineering Society General Meeting, 2005.

[5]  Paul L. Joskow,et al.  Capacity payments in imperfect electricity markets: Need and design , 2008 .

[6]  Benjamin F. Hobbs,et al.  Congestion Management in European Power Networks: Criteria to Assess the Available Options , 2011 .

[7]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[8]  Erik R. Larsen,et al.  Lessons from deregulation: Understanding electricity markets in South America , 2006 .

[9]  Andreas Ehrenmann,et al.  A Comparison of Electricity Market Designs in Networks , 2003, Oper. Res..

[10]  U. Deichmann,et al.  The Economics of Renewable Energy Expansion in Rural Sub-Saharan Africa , 2010 .

[11]  S. Stoft Problems of Transmission Investment in a Deregulated Power Market , 2006 .

[12]  Ann van Ackere,et al.  Does size matter? Simulating electricity market coupling between Colombia and Ecuador , 2015 .

[13]  Ingo Vogelsang,et al.  Toward a combined merchant-regulatory mechanism for electricity transmission expansion , 2007 .

[14]  Dominique Finon,et al.  Generation capacity adequacy in interdependent electricity markets , 2011 .

[15]  D. Newbery,et al.  Evolution of electricity markets: Does sequencing matter? , 2005 .

[16]  Georg Zachmann,et al.  Inefficient arbitrage in inter-regional electricity transmission , 2010 .

[17]  Peter Cramton,et al.  The Convergence of Market Designs for Adequate Generating Capacity , 2006 .

[18]  Ignacio J. Pérez-Arriaga,et al.  A plausible congestion management scheme for the internal electricity market of the European Union , 2005 .

[19]  C. J. Franco,et al.  Simulating power integration in Latin America to assess challenges, opportunities, and threats , 2013 .

[20]  J. Contreras,et al.  A Three-Level Static MILP Model for Generation and Transmission Expansion Planning , 2013, IEEE Transactions on Power Systems.

[21]  Marcelo Saguan,et al.  Generation adequacy and transmission interconnection in regional electricity markets , 2009 .

[22]  S. Oren,et al.  Proactive planning and valuation of transmission investments in restructured electricity markets , 2006 .

[23]  Felix Höffler,et al.  Investment coordination in network industries: the case of electricity grid and electricity generation , 2013 .

[24]  J. Rosellón,et al.  Incentives for Transmission Investment in the PJM Electricity Market: FTRs or Regulation (or Both?) , 2010 .